FREE Panel
5/38
2
MECHANICAL INSTALLATION
IMPORTANT! Always make sure the device is switched OFF before touching
All operations must be carried out by qualified personnel.
Do not mount devices in extremely damp and/or dirt-laden areas; they are designed for use in places with ordinary or
normal levels of contamination.
Make sure the area near the cooling slots is ventilated.
Mounting the FREE Panel (EVP)
Designed for panel mounting.
Make a 138x68mm hole.
Remove the front panel (figure 1) and make 4 holes in the panel that the controller is to be mounted on (Figure 2, points
A/B/C/D) or two holes (Figure 2, points E/F) of dia. 2.7 mm at the specified spacing (Figure 2).
Insert the device, fixing it with the screws. Press the front of the remote terminal to close.
Figure 1
Cut out EVP
Figure 2
Cut out EVP
68
138
150
90
2.7
(x 6)
84
A
B
D
C
E
F
<IMG INFO>
Summary of Contents for FREE Panel EVP 3300/C
Page 1: ...EN Panel Panel Mount Programmable Controller Installation Manual...
Page 33: ......
Page 37: ......