background image

WARNING

Do not 

climb on framework or counter top (where present).

Do not

 use a steel hammer to assemble framework, doing so may cause 

damage to surface finishes or bodily injury.

Note: no specialist tools are required to assemble this product but if so 

required, use a rubber or wooden mallet only.
Do not

 assemble framework on a steep incline.

Do not

 let rain or snow accumulate on the roof canopy.

When new, the framework assembly may be stiff. This stiffness will ease with 

regular use.

When new, the framework of this product may contain loose metal filings. Be 

careful when first assembling.

When new, oil residue may be present around connection points. Be careful 

when first assembling. 

This product is designed to withstand inclement weather conditions but it is 

always recommended that additional ballast or grounding anchors be used 

wherever possible. Anchoring is your responsibility. Damages caused by 

poor weather conditions are not warranted. 

In extreme gusty conditions it is advised that framework is disassembled 

entirely.

This framework is designed for temporary use only and is not a permanent 

structure.

Read this before setting up or using your Gavin Kenning Engineering Limited 

product.

Improper use of this product and/or its components can cause damage to equipment or 

property, serious personal injury or death.

Gavin Kenning Engineering Limited shall not be liable for any damages arising out of 

the use of this product, including, but not limited to, damages for economic loss of 

profits or savings, lost wages; damages to or loss of use of property; bodily injury; 

medical payments; pain and suffering; and loss of consortium.

DISCLAIMER

Summary of Contents for BAKEWELL

Page 1: ...BAKEWELL elite 8 x 4 MARKET STALL ASSEMBLY GUIDE ...

Page 2: ...th 1ft 0 3m Length 4ft 3in 1 30m Length 6ft 6in 1 98m Length 3ft 10in 1 17m Length 4ft 1 22m 2 pieces B Roof Overhang Sections Length 1ft 6in 0 45m 4 pieces 2 pieces 3 pieces 3 pieces 4 pieces 7 pieces 2 pieces Roof Risers Male Roof Bars Legs Counter Bars Counter Support Bar C D F Length 2ft 6in 0 76m 2 pieces Counter Support Legs I G H 4 pieces Counter Boards K J 2 pieces Roof Tarpaulin Counter S...

Page 3: ... stall frame is designed to slot together by hand as shown in the images below You do not require any specialist tools for assembly Use the below diagram in conjunction with the parts list shown on the opposite page to identify and place the parts within the frame assembly A A B B B B C C D D D E E E H I I H G G G G G G G F F F F ...

Page 4: ...ets and permanently attached ball loop bungees with hooks that are designed to wrap around the market stall frame and hook back over the plastic ball of the bungee in order to keep the tarpaulin taught This product is manufactured by Gavin Kenning Engineering Limited in Derbyshire England For product support call 01773 607505 or email sales tradersupplies co uk Spare parts and accessories can be p...

Page 5: ...inclement weather conditions but it is always recommended that additional ballast or grounding anchors be used wherever possible Anchoring is your responsibility Damages caused by poor weather conditions are not warranted In extreme gusty conditions it is advised that framework is disassembled entirely This framework is designed for temporary use only and is not a permanent structure Read this bef...

Page 6: ...may result in mildew and or rust or other damage to surfaces and finishes Dirt should be removed from tarpaulins and framework using a cloth soap and warm water Do not machine wash Dirt can be removed from plywood counter boards using a stiff brush and a small amount of water Do not use caustic products such as bleach to clean any part of this product Doing so may cause damage to surface finishes ...

Page 7: ...er assistance with warranty claims please contact Gavin Kenning Engineer ing Ltd by phone 01773 607505 by email sales tradersupplies co uk or by post Gavin Kenning Engineering Ltd Units 1 4 Keys Road Nix s Hill Industrial Estate Somercotes Derbyshire DE55 7FQ In all communications proof or purchase will be required along with a description and photograph of the claimed defect LIMITATION OF IMPLIED...

Reviews: