Begin by first attaching the center points on both vertical (left/right) sides, 

steps 1-2

. Then the center points on both 

horizontal (top/bottom) sides, 

steps 3-4

. Once all center points have been secured, make sure the screen material is 

still within the marked areas before proceeding to attach the next springs.  

Continue attaching the rest of the springs to the material in the following order in 

steps 5-12

 

 

 

 

 

 
 

 
 
 

 
 
 
 
 
 
 
 
 
 
Note (after all springs have been attached): 

Correct material installation

 –Corners of the screen material are properly wrapped around the corner edges of the 

frame and material is evenly tensioned and flat, creating a nicely taut surface. 

 

Incorrect material installation

 –The corners of the screen material are not properly wrapped along the edge of the 

frame leaving the material with unbalanced tension and an uneven finish. To correct, detach springs from material at 

the corner(s) where material does not lie flat along the edge of the frame, reposition the material so that it lies flat 

and wraps along the edge of the frame, and reattach springs to the material. 

 

Center Support Bar

 

Step  8:

  Insert  the 

Center 

Support  Bar  (o)

  into  the  upper 

top  groove  on  the  back  of  the 

frame with the bottom end near 

the approximate center point of 

the  frame  and  rotate  it  in  at  an 

angle so that both ends of the bar 

are in alignment with the groove. 

 

 

Attention: Do not proceed with the Edge Trim installation until making sure there are no ripples in the material.

 

 

o. 

11 

10

12 

To avoid ripples forming in the material it is imperative that all of the corners are properly wrapped around the 

edges as illustrated in the check mark diagrams. 

 

Summary of Contents for Aeon CLR 3

Page 1: ...ojection screen surface will affect the quality and performance of the projection image Follow the instructions below to properly maintain the screen 1 The screen surface has a horizontal linear struc...

Page 2: ...e Trim Parts List Qty Item 2 pcs Main Frame Parts Qty item 2 pcs Edge Trim Parts Part A vertical frame Part D Part B horizontal frame Part E Part C horizontal frame Part F 2 Hardware Parts List a M4 4...

Page 3: ...izontal frame sections Make sure all holes are in alignment and the frame pieces are flush no gaps They should form perfect right angles Item Parts List 103 123 a Center Joints M4 bottom position 2 2...

Page 4: ...ook one end of the spring and secure inside the groove of the frame use the spring hook h to attach the spring to the hole located on the screen material s outer edge in the following order Make sure...

Page 5: ...material are not properly wrapped along the edge of the frame leaving the material with unbalanced tension and an uneven finish To correct detach springs from material at the corner s where material d...

Page 6: ...right sides edge trim frames d using the elbow joints f and secure with four M4x4 screws m on all corners Step 2 Step 10 Install the angle cover n on each corner of the frame using the M4x4 screws m N...

Page 7: ...frame Notice to Installer Material Tip Proper Projector Placement for CLR 3 The CLR 3 is exclusively for table mounted ultra short throw projectors Overhead placement or a standard projector will mak...

Page 8: ...l anchor then screw in the M5x50 wood screws with a screwdriver Make sure the brackets are leveled Step 14 Position the fixed frame screen onto the top wall brackets as shown below and push down at th...