Rev.08012022JA
3
4. Carefully take out the screen material tube from the carrying bag and
ONLY
handle it
HORIZONTALLY
with two hands to avoid dropping it
(Fig. 8).
5. Once the screen material tube is on a flat surface horizontally, remove both end caps and gently pull out
the screen material out of the tube.
6. Unroll the material, remove the inner protective foam sheet, and set it aside.
7. Lift the unrolled material from each end (Fig. 9) place it on top of the frame with the projection side
facing up (Fig. 10).
DO NOT lift from the middle section.
8. Begin attaching the material from the corners in the following
sequence (Fig. 11).
9. After all the corners have been attached, continue
snapping the buttons on the top/bottom of the frame studs
(Fig 12-13).
10. Lastly, pull the screen material so it can stretch out and attach it to the velcro on the left and right sides.
Smooth it out as needed and reattach it to assure a flat installation.
CAUTION!
THE PROJECTION FABRIC IS A DELICATE OPTICAL/LENTICULAR SCREEN MATERIAL AND SHOULD
NOT BE FOLDED, BENT, OR CREASED. ALWAYS MAINTAIN SCREEN MATERIAL FLAT AND TAUT
DURING SETUP AND DISASSEMBLY.
IMPORTANT
:
TWO PEOPLE ARE REQUIRED TO SETUP AND INSTALL THE MATERIAL TO AVOID
PERMANENT DAMAGE. ANY DAMAGES TO THE SCREEN MATERIAL WILL VOID YOUR WARRANTY.
Fig. 8
Fig. 11
Fig. 12
Fig. 13
Fig. 10
Fig. 9