Elite ProAV AV Yard Master Series User Manual Download Page 2

Rev. 11/27/2018 

eliteproav.com

  

 

Take an example for 120” with 14pcs steel tube: 

 

 

 

 

 
 
 

 

Screen Material Assembly 

1.

 

Lay the assembled frame on the floor and take caution not to scratch the frame and/or floor 

surface. 

Note: The silver securing pegs on each end of the tube should be facing the floor.

 

 

2.

 

Find the opening of the screen material and start by sliding it from the top of the frame, 

with the back of the screen material facing the floor.  With the help of someone 

preferably, continue to pulldownward until the screen material is completely on the 

frame. Make sure the screen material is properly centered before moving to next step. 

 

3.

 

Once the screen material is completely on the frame, fasten the Velcro straps to secure 

the material (as shown in image below). The straps are adjustable to pull the screen tight 

and stretch the material to achieve a flat projection surface. 

 

 

 

 

 

Securing the Screen with the Guy-Ropes and Stakes to the ground 

1.

 

Tiethe Guy-Ropes to the earon each of the top corners of the frame. 

 

Reviews: