background image

 

Installation 

 

Installation - Ducting version 

 

If possible, disconnect and move freestanding or slide-in 
range from cabinet opening to provide easier access to 
rear wall. Otherwise put a thick, protective covering over 
countertop, cooktop or range to protect from damage 
and debris. Select a flat surface for assembling the unit. 
Cover that surface with a protective covering and place 
all canopy hood parts and hardware in it. 

 

   Determine and mark the centerline on the wall where the 

canopy hood will be installed. 

 

   Select a mounting height comfortable for the user and 

mark on wall. 

 

   Tape template, matching center-line and hood bottom. 

Mounting the duct cover bracket 

The  duct  bracket  should  be  installed  against  the  back  wall 
and flush with the ceiling. 
This  bracket  will  hold  the  telescopic  duct  cover  in  place  at 
the top. 
 

Secure the bracket to the wall:

 

• 

Align  the  marked  centerline  on  the  bracket  with  the 
centerline on the wall. 

• 

Mark 2 screw hole locations in the wall. 

• 

Drill 5/16" pilot holes in the marked locations. 

• 

Install wall fastener anchors. 

• 

Drive  wood  screws,  by  hand,  into  the  fastener  to  allow 
anchors to expand. Remove the screws. 

• 

Secure  the  bracket  to the  wall  with  wood  screws  and/or 
fasteners. 

  

  

Ceiling ducting 

If the duct will vent straight up to the ceiling: 
•   Use  level  to  draw  a  line  straight  up,  from  the  centerline 

on the template to the ceiling. 

•   Measure at least 4 -5/8 ” from the back wall to the circle 

center of an 8-½” hole on the ceiling. 

 

Wall ducting 

If ductwork will vent to rear: 

Note:

 for minimum duct cover extension we suggest to use 

a round to rectangle duct adapter. 
•   Use a level to draw a line straight up from the centerline 

on the template. 

•   Measure  at  least  26  -  1/2"  (the  measure  might  vary 

dependig  on  the  elbow  used)  above  the  pencil  line  that 
indicates  the  bottom  installation  height,  to  the  circle 
center  of  an  8-½”  diameter  duct  hole  (Hole  may  be 
elongated for duct elbow). 

  

  
House wiring location 

•   The  junction  box  is  located  on  the  top  left  side  of  the 

hood. 

•   Wiring  should  enter  the  back  wall  at  least  20  -  1/4" 

above the bottom of the installation height, and within 7-
5/8" and 4-7/8"of the left side of the centerline. 

  

  

  

Summary of Contents for Lugano ELG636SS

Page 1: ...nstallation Guide Guide d utilisation d entretien et d installation Gu a de instalaci n uso y mantenimiento READ AND SAVE THESE INSTRUCTIONS LISEZ CES INSTRUCTIONS ET CONSERVEZ LES LEA Y GUARDE ESTAS...

Page 2: ......

Page 3: ...Shock Do Not Use This Hood With Any External Solid State Speed Control Device WARNING TO REDUCE THE RISK OF A RANGE TOP GREASE FIRE a Never leave surface units unattended at high settings Boilovers ca...

Page 4: ...power supply conduit at the range hood and at the junction box Copies of the standards listed may be obtained from National Fire Protection Association Batterymarch Park Quincy Massachusetts 02269 CSA...

Page 5: ...ent anchors screws 6 pieces 1 8 x 3 8 Assembly screws 8 pieces Parts not supplied Optional Accessories Ductless Recirculating Kit To be used only in the Ductless Recirculating version includes charcoa...

Page 6: ...6 Dimensions and Clearances Ductless Recirculating version Only Ducting version Only...

Page 7: ...und Pipe Preparation Do not cut a joist or stud unless absolutely necessary If a joist or stud must be cut then a supporting frame must be constructed Fittings material is provided to secure the hood...

Page 8: ...ll Drill 5 16 pilot holes in the marked locations Install wall fastener anchors Drive wood screws by hand into the fastener to allow anchors to expand Remove the screws Secure the bracket to the wall...

Page 9: ...Mark upper screw holes locations in the wall IMPORTANT Check to be sure that hole locations are leveled and correctly centered by the vertical centerline Drive upper wood screws by hand Leave of dist...

Page 10: ...Upper Duct Cover may be placed upside down to hide or unhide louver holes Position the duct cover over the mounted hood Slide the bottom of the duct into the canopy area Position the top of the duct...

Page 11: ...the wall Mark 2 screw hole locations in the wall Drill 5 16 pilot holes in the marked locations Install wall fastener anchors Drive wood screws by hand into the fastener to allow anchors to expand Rem...

Page 12: ...12...

Page 13: ...de down to hide or unhide louver holes Position the duct cover over the mounted hood Slide the bottom of the duct into the canopy area Position the top of the duct over the duct mounting bracket If a...

Page 14: ...14...

Page 15: ...15...

Page 16: ...16...

Page 17: ...ease particles This must be cleaned once a month using non aggressive detergents either by hand or in the dishwasher which must be set to a low temperature and a short cycle When washed in a dishwashe...

Page 18: ...18...

Page 19: ......

Reviews: