5
LIST OF MATERIALS
Removing the packaging.
I
CAUTION
Remove carton carefully, Wear gloves to protect against sharp edges.
I
WARNING
Remove the protective film covering the product before putting into operation.
Supplied Part
Pieces
Supplied Part
Pieces
Hood assembly with blower and
LED lamps already installed
Lower and upper duct covers
Upper: 2
Lower: 2
5x45 mm
4
8” round air transition
1
4.2x8 mm
60
Duct cover brackets
4
4 x 8 mm
4
Vertical supports
Upper: 4
Lower: 4
3.5x6.5 mm
4
2.9x3 mm
2
Leveling screws
2
Torx adapter
#10: 1
#20: 1
8x40 mm
4
Mounting template
1
Parts no supplied
Tools/Materials required
• Wire nuts
• Tape to mount template
• 8” (20.3 cm) rounded metal duct length to suit installation
• Measuring tape
• Pliers
• Gloves
• Knife
• Safety glasses
• Electric drill with
5
⁄
16
” and
3
⁄
8
” bits
• Strain relief
• Spirit level
• Duct tape
• Phillips (Posidrive) #2 Screwdriver
• Wire cutter/stripper
• Masking tape
• Hammer
• Saw, jig saw or reciprocating saw
Optional accessories and consumable parts
KIT
# Part
Long Chimney
Extension
KIT0145610
In Line Motor
1200 CFM
KIT0145608
In Line Motor
1500 CFM
KIT0145609