ELEQ LS-84 Installation Manual Download Page 2

 

 

 

 

 

Always avoid working on live parts of an installation. 

 

 

Attention 

 

A double isolated connection box may only be replaced by a 

double isolated connection box. The double isolated 

connection box cannot be replaced by a regular connection box 

with automatic earthing. 

 

 

Functional Description 

 

The 5L4211 connection box is intended to be fitted with one 

D0I fuse. The fuse capacity is limited to max 6A. 

The phase to be connected to the fuse has to be chosen by the 

black selection pin (screw type). 

 

The  connection 

box is equipped with a ‘Surge protection 

device’ (SPD) module.

 

 

Assembly  

 

Attention 

Remove the fuse during assembly of the connection boxes 

 

1. 

Ensure a safe working area during assembly, maintenance 

and inspection of the connection box. Disconnect the power 

of the primary circuit and make sure it cannot be enabled 

unintentionally. 

2. 

Remove the transparent lid, fuse, selection pin  and the 

intermediate cover. 

3. 

Mount the connection box with the upper and lower 

connection in the lighting pole. 

4. 

Remove the cover with SPD (pull off the mantle terminals). 

There is a possibility to hook this on top of the connection 

box. 

5. 

Connect the incoming and (if present) outgoing ground 

cable to terminals N, 1, 2, 3. 

6. 

Replace the cover with SPD on the mantle terminals. 

7. 

For in-line connection of the SPD:

 connect the outgoing 

cable  to the armature to terminals 6 and 7 (spring 

connection) 

 

For parallel connection of the SPD:

 connect the outgoing 

cable  to the armature to terminals 4 and 5 (screw 

connection) 

8. 

Tightly mount strain relief block. 

 

9. 

Check if the connections are mounted properly and firmly. 

10. 

Mount the intermediate cover and the selection pin. 

11. 

Install the fuse. Note: fuse type: D01 (E14), max 6A. 

12. 

Mount the transparent lid and screw tightly.  

    

      

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Incoming 

 

Outgoing (SPD in-line) 

N = Neutral 

 

6 = Neutral wire to armature 

1 = Phase L1 

 

7 = Phase wire to armature

 

2 = Phase L2 

 

 

3 = Phase L3 

 

Outgoing (SPD parallel)

 

 

 

 

4 = Neutral wire to armature 

 

 

 

5 = Phase wire to armature 

 

If required, incoming terminals N, 1, 2 3 can also be looped to 

the next lighting pole. 

 

Attention

 

Terminal box is provided with phase selection: the phase to be 

connected to the fuse has to be chosen by the black selection 

pin (screw type).

 

 

Wiring Diagram 

 

     

 

 

Maintenance and inspection 

 

The connection box should be situated on a dry and clean 

location. 

 

The connection box should be mounted firmly. 

 

The connections should be mounted firmly. 

 

Indicator on SPD is on when power is switched on. 

 

Attention 

Always avoid working on live parts of an installation. 

 

 

Disassembly instruction 

 

1. 

Disconnect the power of the main circuit and make sure it 

cannot be enabled unintentionally. 

2. 

Unmount the transparent lid. 

3. 

Remove the fuse, selection pin and the intermediate cover 

4. 

Remove the strain relief block. 

5. 

Disconnect the armature cables. 

6. 

Remove the SPD 

7. 

Disconnect the ground cables 

8. 

Disconnect the connection box from the lighting pole. 

 

 

Recycling

 

When the product has reached ‘end of life’, it must be recycled. 

Do not dispose this product as unsorted municipal waste. 

Contact a qualified recycler for disposal.

 

 

 

 

 

 

Always avoid working on live parts of an installation. 

 

 

Attention 

 

A double isolated connection box may only be replaced by a 

double isolated connection box. The double isolated 

connection box cannot be replaced by a regular connection box 

with automatic earthing. 

 

 

Functional Description 

 

The 5L4211 connection box is intended to be fitted with one 

D0I fuse. The fuse capacity is limited to max 6A. 

The phase to be connected to the fuse has to be chosen by the 

black selection pin (screw type). 

 

The  connection 

box is equipped with a ‘Surge protection 

device’ (SPD) module.

 

 

Assembly  

 

Attention 

Remove the fuse during assembly of the connection boxes 

 

1. 

Ensure a safe working area during assembly, maintenance 

and inspection of the connection box. Disconnect the power 

of the primary circuit and make sure it cannot be enabled 

unintentionally. 

2. 

Remove the transparent lid, fuse, selection pin  and the 

intermediate cover. 

3. 

Mount the connection box with the upper and lower 

connection in the lighting pole. 

4. 

Remove the cover with SPD (pull off the mantle terminals). 

There is a possibility to hook this on top of the connection 

box. 

5. 

Connect the incoming and (if present) outgoing ground 

cable to terminals N, 1, 2, 3. 

6. 

Replace the cover with SPD on the mantle terminals. 

7. 

For in-line connection of the SPD:

 connect the outgoing 

cable  to the armature to terminals 6 and 7 (spring 

connection) 

 

For parallel connection of the SPD:

 connect the outgoing 

cable  to the armature to terminals 4 and 5 (screw 

connection) 

8. 

Tightly mount strain relief block. 

 

9. 

Check if the connections are mounted properly and firmly. 

10. 

Mount the intermediate cover and the selection pin. 

11. 

Install the fuse. Note: fuse type: D01 (E14), max 6A. 

12. 

Mount the transparent lid and screw tightly.  

    

      

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Incoming 

 

Outgoing (SPD in-line) 

N = Neutral 

 

6 = Neutral wire to armature 

1 = Phase L1 

 

7 = Phase wire to armature

 

2 = Phase L2 

 

 

3 = Phase L3 

 

Outgoing (SPD parallel)

 

 

 

 

4 = Neutral wire to armature 

 

 

 

5 = Phase wire to armature 

 

If required, incoming terminals N, 1, 2 3 can also be looped to 

the next lighting pole. 

 

Attention

 

Terminal box is provided with phase selection: the phase to be 

connected to the fuse has to be chosen by the black selection 

pin (screw type).

 

 

Wiring Diagram 

 

     

 

 

Maintenance and inspection 

 

The connection box should be situated on a dry and clean 

location. 

 

The connection box should be mounted firmly. 

 

The connections should be mounted firmly. 

 

Indicator on SPD is on when power is switched on. 

 

Attention 

Always avoid working on live parts of an installation. 

 

 

Disassembly instruction 

 

1. 

Disconnect the power of the main circuit and make sure it 

cannot be enabled unintentionally. 

2. 

Unmount the transparent lid. 

3. 

Remove the fuse, selection pin and the intermediate cover 

4. 

Remove the strain relief block. 

5. 

Disconnect the armature cables. 

6. 

Remove the SPD 

7. 

Disconnect the ground cables 

8. 

Disconnect the connection box from the lighting pole. 

 

 

Recycling

 

When the product has reached ‘end of life’, it must be recycled. 

Do not dispose this product as unsorted municipal waste. 

Contact a qualified recycler for disposal.

 

 

 

 

 

 

Always avoid working on live parts of an installation. 

 

 

Attention 

 

A double isolated connection box may only be replaced by a 

double isolated connection box. The double isolated 

connection box cannot be replaced by a regular connection box 

with automatic earthing. 

 

 

Functional Description 

 

The 5L4211 connection box is intended to be fitted with one 

D0I fuse. The fuse capacity is limited to max 6A. 

The phase to be connected to the fuse has to be chosen by the 

black selection pin (screw type). 

 

The  connection 

box is equipped with a ‘Surge protection 

device’ (SPD) module.

 

 

Assembly  

 

Attention 

Remove the fuse during assembly of the connection boxes 

 

1. 

Ensure a safe working area during assembly, maintenance 

and inspection of the connection box. Disconnect the power 

of the primary circuit and make sure it cannot be enabled 

unintentionally. 

2. 

Remove the transparent lid, fuse, selection pin  and the 

intermediate cover. 

3. 

Mount the connection box with the upper and lower 

connection in the lighting pole. 

4. 

Remove the cover with SPD (pull off the mantle terminals). 

There is a possibility to hook this on top of the connection 

box. 

5. 

Connect the incoming and (if present) outgoing ground 

cable to terminals N, 1, 2, 3. 

6. 

Replace the cover with SPD on the mantle terminals. 

7. 

For in-line connection of the SPD:

 connect the outgoing 

cable  to the armature to terminals 6 and 7 (spring 

connection) 

 

For parallel connection of the SPD:

 connect the outgoing 

cable  to the armature to terminals 4 and 5 (screw 

connection) 

8. 

Tightly mount strain relief block. 

 

9. 

Check if the connections are mounted properly and firmly. 

10. 

Mount the intermediate cover and the selection pin. 

11. 

Install the fuse. Note: fuse type: D01 (E14), max 6A. 

12. 

Mount the transparent lid and screw tightly.  

    

      

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Incoming 

 

Outgoing (SPD in-line) 

N = Neutral 

 

6 = Neutral wire to armature 

1 = Phase L1 

 

7 = Phase wire to armature

 

2 = Phase L2 

 

 

3 = Phase L3 

 

Outgoing (SPD parallel)

 

 

 

 

4 = Neutral wire to armature 

 

 

 

5 = Phase wire to armature 

 

If required, incoming terminals N, 1, 2 3 can also be looped to 

the next lighting pole. 

 

Attention

 

Terminal box is provided with phase selection: the phase to be 

connected to the fuse has to be chosen by the black selection 

pin (screw type).

 

 

Wiring Diagram 

 

     

 

 

Maintenance and inspection 

 

The connection box should be situated on a dry and clean 

location. 

 

The connection box should be mounted firmly. 

 

The connections should be mounted firmly. 

 

Indicator on SPD is on when power is switched on. 

 

Attention 

Always avoid working on live parts of an installation. 

 

 

Disassembly instruction 

 

1. 

Disconnect the power of the main circuit and make sure it 

cannot be enabled unintentionally. 

2. 

Unmount the transparent lid. 

3. 

Remove the fuse, selection pin and the intermediate cover 

4. 

Remove the strain relief block. 

5. 

Disconnect the armature cables. 

6. 

Remove the SPD 

7. 

Disconnect the ground cables 

8. 

Disconnect the connection box from the lighting pole. 

 

 

Recycling

 

When the product has reached ‘end of life’, it must be recycled. 

Do not dispose this product as unsorted municipal waste. 

Contact a qualified recycler for disposal.

 