![Element ELCG-02ASP Instruction Manual Download Page 3](http://html1.mh-extra.com/html/element/elcg-02asp/elcg-02asp_instruction-manual_2387114003.webp)
3
<Features>
This product is a control unit, corona discharge electrode work stand unit a desktop a
corona electrode elctrification system that integrates the. Weight about 23kg
The Y-axis electric cylinder moves 200 mm in the Y direction to perform corona
charging.to hold. The work table size is 180 x 180 mm.
16 pieces of work Φ37mm and t = 1mm or less can be mounted.∙ Corona electrode and
grid electrode on two pairs of manual Z-axis stages .The height can be adjusted.
<Specification>
Control unit
1, high voltage power supply
(1) Corona discharge power supply: 0 to +15.00 kV 1.999 mA Maximum
applied voltage 0 to + 9kV 1.999mAOutput voltage control CV 1 piece
Switchable output voltage and current display digital panel meter
(2) Power supply for grid electrode 0to + 3kV 2mAOutput voltage control
CV 1 piece Switchable output voltage and current display digital meter
(3) HV ON switch 1 mini toggle switch High voltage ON when ON1
(4) kV / mA switch Mini toggle switch For switching digital panel meter
(5) High voltage output section15kV connector 1 piece1 MHV connector
2, work table control switch
(1)
EMG emergency stop switch
(2)
Buzzer reset switch
(3) AUTO switch when ON, AUTO when OFF, manual MAN
(4) 1, 2, 3 switch AUTO OFF
1, electrification process 26 SEC .
return to origin 6.5 SEC
2, electrification process 13 SEC. return to origin 6.5 SEC
3 , electrification process 6.5 SEC. return to origin 6.5 SEC
(5) STANDBY switch Used when returning to origin When
* POWER is ON, be sure to press once before operating each switch.