background image

1. 

Mount the floor crossbar between the right 

hand side with the left hand side. Use 1st and 3rd 
hole from the back. Pretension the bolts before 
the whole rack is raised up.   
 

2. 

Mount the crossbar with ”Eleiko-brackets” in 

the top between the two uprights with lasercutted 
numbers. Pretension the bolts before the whole 
rack is up.  
 

3. 

Insert the weight suspension pins in the big 

holes of the upright in the back. Make sure to use 
a rubber hammer to knock the bolts in through 
the upright in the back and through the weight 
suspensions. (Don’t remove the small weld bump 
on the weight suspension pin) 

 

 

Tightening torque is 197 Nm for M16 bolts. Make 
sure all bolts are tightened before putting on the 
accesories.    

 
4. 

Hang the J-cups on at desired height.   

 

1

 

2

 

3

 

3

 

3

 

3

 

3

 

3

 

4

 

4

 

Reviews: