background image

   

 

 

   

 

 

8

 

9

 

 

 

(

E

-

b

Repeat  Step

E

-

a

).

 

(

E

-

c

If  the  balance  spring  has  been  adjusted  to  the  tension

the

 

problem  still  could  not  be  solved

Please  hang  the  balance

 

spring  to  link  pole  2  instead  of  link  pole  1

.

 

If  the  problem  still  exists

please  change  a  smaller  line  diameter

 

spring  and  repeat  the  above  steps

.

 

(F)

  Methods  to  make  the  boom  in  the  horizontal  position

:

 

(

Attention

The  clutch  device  should  be  locked  in  these 

methods

.) 

a

(

Fs

-

afo

llIof wb

:

oom  is  not  at  the  exact  horizontal  position

please  try

 

 

 

 

Adjust  screw  2  to  diminish 

the  tension

 

 

 

Fig

.

9

.

1

 

 

Shock  absorption 

rubber

 

 
 

Link  pole

 

 

 

 

Balance  crank 

Link  hole  1

 

(

F

-

a

-

1

Refer  to  Fig

.

9

-

1

fall  down  the  arm

and  then  adjust  the

 

shock  absorption  screw  2  to  make  the  boom  in  the  horizontal 
position

If  it  doesn

'

t  work

try  the  next  step

.

 

(

F

-

a

-

2

Loosen  the  locknuts  on  both  sides  of  the  link  pole

rotate

 

the  link  pole  right  or  left  to  adjust  the  arm

then  screw  down

 

the  locknuts  again  when  the  boom  is  in  the  horizontal  position

.

 

(

F

-

b

If  the  boom  is  vibrant  as  it  falls  down  to  the  horizontal

 

position

.

 

(

F

-

b

-

1

Refer  to  Fig

.

9

-

1

adjust  the  shock  absorption  screw  B  to

 

diminish  the  press  to  the  shock  absorption  rubber  B

(

shock

 

absorption  cushion

); 

if  the  adjusting  is  not  satisfied

please

 

try  as  follow

.

 

(

F

-

b

-

2

Unlock  the  clutch  device

and  rise  up  the  boom  to  the

 

vertical  position  manually

Rotate  the  adjusting  screw  for

 

balance  spring  to  enhance  or  diminish  the  tension

.

 

(

F

-

b

-

3

Lock  up  the  clutch  device  and  run  the  machine

If  the

 

problem  still  exists

retry  the  above  steps

.

 

(G)

  The  method  to  lock  up  unlock  the  clutch  device

The  clutch  can

 

not  be  unlocked

Insert  the  clutch  key  and  rotate  it  clockwise  to

 

unlock  it

and  the  anticlockwise  to  lock  it

If  the  clutch  device

 

could  not  been  locked  up  or  unlocked  easily

please  pull  up  or

 

pull  down  the  boom  by  hand  lightly

.(

Refer  to  Fig

.

4

)

 

 

Sway  up 
and  down

 

 

 
 
 
 

Link  hole  2

 

Fig

.

9

.

2

 

 

 

Fig

.

8

 

Summary of Contents for EF-DZJ10F

Page 1: ...EF DZJ10 AC Boom Barrier User s Manual Issue Date 2021 08 Shenzhen Elefine Technology Co Ltd www elefinetech com ...

Page 2: ...chnical team in our factory to ensure a premium quality level that can line up with our parking system products 5 M achine Core Design 3 6 Di rection Rules 4 7 Installation A djustment and Use 5 Installation for Mechanism Part 5 Adjustment and Use of the Mechanism Part 6 Springs Selection Installation and Adjustment 10 7 4 Installation and Connections of the Electric Part 13 7 5 Electricity Adjust...

Page 3: ...2 Notice The Boom Height means height from the boom holding point to the ground ...

Page 4: ...as to prevent the vehicles from being pressed Both external and internal loop detectors are supported 3 7 Open Close and Stop controlling interfaces RS 485 communication serial interface optional Traffic light signal connection device red light for stop green light for pass Remote control and wire control for selection 4 Working environment Balance crank Link hole1 Link hole2 Shock absorption scre...

Page 5: ...xed barrier gate installation rule The bar inside the gate Bar is inside the gate L H Barriers case board Fig 3 Fix the boom to the boom tray with the boom press board then cover the boom capuche with the screws After that fix the cover of the boom to the splint and fasten them with four screws of 4 16 and slip the cover tap to the correspondent hole in the boom cover Finally fasten the cover tap ...

Page 6: ...uts in both sides of link pole until the boom is vertical Then tighten up the locknuts again b If the boom is unsteady in the horizontal position refer to fig 7 screw the adjusting screw of the balance spring clockwise to enhance the spring tension Attention the spring tension could not be too hard Fig 6 Fig 7 D The best methods to adjust the boom Attention the clutch device should be unlocked in ...

Page 7: ... rotate the link pole right or left to adjust the arm then screw down the locknuts again when the boom is in the horizontal position F b If the boom is vibrant as it falls down to the horizontal position F b 1 Refer to Fig 9 1 adjust the shock absorption screw B to diminish the press to the shock absorption rubber B shock absorption cushion if the adjusting is not satisfied please try as follow F ...

Page 8: ...weight of the arm C Spring replacement C a Rise up the boom to the vertical position If the power is off unlock the clutch device put the boom to the vertical position manually and make sure the boom would not fall down C b Spin the bottom adjusting nut anticlockwise to disassemble it and the baffle ring C c Fall down the boom to the horizontal position manually loosen from the the spring fixed sl...

Page 9: ...ication Exterior Vehicles Detector Signal Interface Special for Motorcade Down Limit Signal Output Photocell Power Output C e Insert the screw mandrel again and fix it to the selected link hole C f Rise up the boom to the vertical position again and make sure the boom will not fall down C g Install the adjusting nuts and the baffle ring in the lower part of the screw mandrel and adjust the press t...

Page 10: ...unication to control the boom UP and DOWN Please link the computer with Rs485 interface by the communication module The software please refer to the instruction in the disk Optional device H Terminal special for motorcade If the users have installed the loop detector and do not want the barrier boom fall down automatically when there are still some cars in line behind the passing car Then please a...

Page 11: ...cked or not 2 There is too much vibrant when the boom is rising or falling a Please check whether the shock absorption rubber is broken or not if yes change a new one b Please check whether the balance spring is overused and distorted If yes change a new one or spin bottom adjust nut 3 The boom could not rise up or fall down to the end a When change a long boom to a short one please readjust it b ...

Page 12: ...h the one on the remote controller and the infrared photo cell please adjust it as below There is a control code table pasted on the back of the remote controller and the transformer of the radio controller for coding Open the controller cover take out the battery There is a code pad on the PCB the direction is from right to left and the first code is on the right 0 stands for linking the middle a...

Page 13: ...om is at the rising limit position adjust this laser obstacle to make it point upwards and form an angle 90 with the arm When the laser obstacle moves into the slot and the red light is on the falling limit will work and the boom will lie horizontally Check the horizontal angle between the boom and the horizontal position and adjust the laser obstacle to make the boom be perfectly horizontal 20 ...

Reviews: