1
CONTENTS
1.
GENERAL ARRANGEMENT DRAWING OF ANAEROBIC WORKSTATION
2
2.
GENERAL SPECIFICATION
3
3.
GAS SUPPLIES
4
4.
ELECTRICAL SUPPLES
4
5.
INSTALLATION OF GAS AND ELECTRIC DRAWING
5
6.
ASSEMBLY INSTRUCTIONS DRAWING
6
7.
CHECKING THE INCUBATOR ATMOSPHERE FOR OXYGEN
7
8.
PREPARING THE ANAEROBIC INDICATOR SOLUTION
7
9.
COMMISSIONING THE CABINET
8
10.
CHECKING THE GAS FLOW
9
11.
WORKING INSIDE THE CABINET WITH BARE HANDS
10
12.
SLEEVE ASSEMBLY
11
13.
REMOVAL OF CONDENSATION FROM INSIDE THE INCUBATOR
12
14.
THE WATER GAS TAP TUBE
12
15.
TRANSFERRING ITEMS INTO THE INCUBATOR
13
16.
TRANSFERRING ITEMS OUT OT THE INCUBATOR
13
17.
THE HEATING SYSTEM
13
18.
THE TEMPERATURE CONTROLLER
13
19.
THE GAS CIRCULATION SYSTEM
14
20.
CHANGING THE CATALYST AND CONDITIONER
14
21.
CLEANING
14
22.
TEST RECORD SHEET
15
23.
DECLARATION OF CONFORMITY
16
24.
CIRCUIT DIAGRAMS
17