29
D - Refrigeration System
Evacuating and Recharging Connections
Figure
E2
10. Slowly open the high-side manifold gauge
valve to allow the compressor to remove any
refrigerant trapped in the high-side hose and
the process fitting.
11. Close both of the manifold gauge valves. If
the high-side gauge reading rises, the pinch-
off must be corrected before proceeding.
12. Remove the high-side process tube adaptor
and solder the process tube closed.
13. Clamp the low-side process tube with the
pinch-off tool while the unit is running.
Remove the low-side process tube adaptor
and solder the process tube closed.
14. Check the process tubes for refrigerant leaks.
Final Leak Test
1. With the refrigerator turned OFF leak test all
low-side system components.
2. Turn the unit ON and run until the condenser
is warm. Leak test the high-side system
components.
Summary of Contents for Wine Cooler / Beverage Center
Page 18: ...18 C Electrical Components Operation ...
Page 19: ...19 C Electrical Components Operation ...
Page 38: ...38 CABINET DIAGRAM Exploded View Diagrams ...
Page 39: ...39 DOOR DIAGRAM Exploded View Diagrams ...
Page 42: ...42 NC PB SWITCH BOTTOM DRAWER SWITCH Addendum for Refrigerator Drawers ...
Page 43: ...43 Addendum for Refrigerator Drawers ...
Page 44: ......