Gas connection
23
8 Gas connection
8.1 Fasten the label
Before installing the machine fasten the label “Read the user instructions” on the inside of the
door in a suitable place and at the front panel.
The label must have the correct country code, choose the correct label from the gas kit.
Not applicable for Japan.
GB, IE
Read the tec hnica l
ins tructions be fore
ins ta lling the a ppli-
anc e .
Read the us e r
ins tructions be fore
lighting the a pplia nce .
This a pplia nce ma y
only be ins ta lle d in a
room if the room
me e ts the a ppropria te
ve ntila tion re quire -
me nts s pe cifie d in the
nati onal ins ta lla tion
regul ations .
Art. No. ...........
GB
, IE
Rea
d th
e te
chn
ical
inst
ruc
tion
s b
efo
re
inst
allin
g th
e a
ppl
i-
anc
e.
Rea
d th
e u
ser
inst
ruc
tion
s b
efo
re
ligh
ting
the
ap
plia
nce
.
Thi
s a
ppl
ian
ce
ma
y
onl
y b
e in
sta
lled
in
a
roo
m i
f th
e ro
om
me
ets
the
ap
pro
pria
te
ven
tilat
ion
req
uire
-
me
nts
sp
ecif
ied
in
the
nat
ion
al in
sta
llati
on
reg
ula
tion
s.
Ar
t. N
o. .
.....
.....
fig.7113
⑲
8.2 General
May only be carried out by qualified personnel.
Mount a shut-off valve upstream from the machine.
The factory nozzle pressure setting corresponds to the fuel value given on the data label.
Check that the nozzle pressure and fuel value correspond with the values in the gas tables on the
following pages. If not, contact the supplier.
Bleed the pipe system before connecting the machine.
Note!
After connection all joints must be checked. There must not be any leaks.