background image

Installation manual

T4190

Compass Control

487 05 42 61.00

EN

Summary of Contents for T4190

Page 1: ...Installation manual T4190 Compass Control 487 05 42 61 00 EN ...

Page 2: ......

Page 3: ...th water Mechanical electrical and gas installations must only be carried out by authorised personnel If the machine has a fault this must be reported as soon as possible to the person in charge This is important for your own safety and for the safety of others Gas dryers only The machine is not to be installed in rooms containing cleaning machines with perchloroethylene TRICHLOROETHYLENE or CHLOR...

Page 4: ...4 4 ...

Page 5: ...s Safety instructions 3 Technical data 6 Unpackning 8 Ship installation 9 Door reversal 10 Installation 11 Function check 21 The manufacturer reserves the right to modify design and material specifications without notice ...

Page 6: ...tor 0 8 0 8 Capacity Factor 1 25 7 5 kg 7 5 kg Factor 1 33 5 8 kg 5 8 kg Heat effect Electric 6 0 kW 6 0 kW 8 0 kW 8 0 kW Air consumption Heat effect 6 0 kW 270 m3 h 270 m3 h 8 0 kW 290 m3 h 290 m3 h Piping Evacuation Ø 125 Ø 125 Gas piping ISO 7 1 R1 2 Pressure drop Evacuation 6 0 kW 380 Pa 380 Pa 8 0 kW 350 Pa 350 Pa Sound power level LW 68 dB A 68 dB A Technical data ...

Page 7: ...0 745 1130 420 110 120 960 45 55 1445 B D F H A C E G I K 1 2 3 4 L M mm 575 80 M L 5 Dimension sketch 1 Door opening 5 Gas connection 2 El connection 3 Pipe connection evacuation 4 Connection for external control Technical data ...

Page 8: ...ver there should be free access to the back of the dryer for the purpose of servicing it Mechanical installation Adjust the dryer to ensure that it is horizontal and stands firmly on all four feet The maximum height adjustment of the feet is 50 mm When the adjustment has been made lock the feet by means of the lock nuts Normally the dryer requires no bolting to the floor or foundation However tumb...

Page 9: ...Fasten the 4 fittings supplied with the dryer to the foundation using 4 x M10 set screws or other devices of the same dimension not supplied The 4 feet from the dryer are mounted on the base and the feet are fastened to the fittings The dryer is fastened to the base using 4 x M10 bolts supplied with the base and is tightened with 20 Nm Fig 1 Dryer Front Drilling template ...

Page 10: ...the opposite side Loosen cable hanger with cable and mount on the opposite side Strap the cable Move door switch to the opposite side Mount T fitting A at the bottom of the right side On the door Move door handle to the opposite side screw screws into holes Mount T fitting B at the top of the right side Move ball lock in the door to the opposite side without turning the lock move cover plate On th...

Page 11: ...e air inlet behind the dryer The area of the air inlet opening must be 5 times the size of the vent pipe area The resistance in the grating slats on the airinlet cover plate should not exceed 10 Pa 0 1 mbar The air consumption is 400 m3 h The area of the inlet opening is the area through which the air can flow without resistance from grating slatted cover Note that gratings slatted covers often bl...

Page 12: ...must be protected against rain foreign objects and prevailing winds Note In cold areas condensation may cause frost damage to the building Gentle bends To keep the air flowing ensure proper dryer operation and minimise lint buildup in the exhaust system never connect ducts at right angles always use gentle bends Service organisation dealer If you have questions relating to the design of the exhaus...

Page 13: ...ressure setting corresponds to the heating value printed on the data label on the back of the dryer Check that the nozzle pressure and heating value are according to the values given in the table If not contact the supplier Bleed the pipe system before connecting the dryer After connection test all joints for leaks Installation To be carried out by qualified personnel ...

Page 14: ...ew 5 Control Box gas valve 6 Measuring branch supply pressure Test run 1 Loosen the measuring branch screw 2 anti clockwise a 1 4 of a turn 2 Connect a manometer to measuring branch 2 3 Select a programme that uses heat 4 Start the dryer 5 Check the nozzle presure see tables on the following pages 6 If necessary adjust adjusting screw 4 found behind nipple 3 7 After testing prepare the dryer for u...

Page 15: ...nverted to town gas 6 kW use the air reducing plate and the matching nozzle To change the reducing plate follow step 3 7 in the chapter Changing the nozzle Subsequently mount the plate in the 4 holes and then follow step 8 9 see fig 2 Town gas 8 kW If the dryer is to be converted to town gas 8 kW use the air reducing plate and the matching nozzle To change the reducing plate follow step 3 7 in the...

Page 16: ...e of the heating box fig 1 5 Dismount the compression nut and the compression ring Pull the coupling from the nozzle fig 2 6 Unscrew the 8 screws of the heating box 7 Lift the cover upwards and pull it to the right still sitting on the edge 8 Dismount the nozzle and replace it with the right dimension see tables on the following pages 9 Assemble in the opposite order as described above ...

Page 17: ...1 95 Germany LPG 50 30 1 3 A GNH 20 8 2 2 35 GNL 20 12 1 2 35 Holland LPG 30 30 1 3 A GNL 25 12 1 2 35 Austria LPG 50 30 1 3 A GNH 20 8 2 2 35 Japan LPG 28 28 1 3 A Denmark Town gas 8 4 5 3 95 B Sweden Group a Italy Town gas 8 3 5 3 95 B Group b Gas installation Tables of pressure and adjustments Note Because of the differences in gasinstallation regulations in European Union it is important to us...

Page 18: ...28 37 28 37 1 45 A Belgium GNH 20 25 20 25 2 2 GNL 20 25 20 25 2 2 Germany LPG 50 30 1 45 A GNH 20 9 2 65 GNL 20 13 4 2 65 Holland LPG 30 28 8 1 25 A GNL 25 13 4 2 65 Austria LPG 50 30 1 25 A GNH 20 9 2 65 Japan LPG 28 28 1 45 A Denmark Town gas 8 4 5 4 45 C Sweden Group a Italy Town gas 8 3 5 4 45 C Group b Installation Note Because of the differences in gasinstallation regulations in European Un...

Page 19: ...ecessary If you still want to connect your machine across an earth leakage circuity breaker please remember the following For maximum reliability connect only one machine per earth leakage circuit breaker It is important that the earth wire is properly connected including to earth leakage circuit breaker Heating type Voltage type Total rating kW Fuse A Gas 400 415V 3N AC 0 25 10 Gas 400 480V 3 AC ...

Page 20: ...nal L1 L2 L3 and Neutral to terminal N 3N AC only as shown in example 3 AC and 3N AC in the figure When the installation is completed check That the drum is empty Turn on the main switch and choose a drying program Start the machine External connection 3NAC A special connection terminal is located at the mains connection The connection terminal is used for Connection control of external fan or a c...

Page 21: ...rection of rotation of the drum is clockwise Isolate the machines electrical supply swap the positions of the incoming supply phases at the main terminal block re establish the supply and re test Final test Let the dryer work for 5 minutes on a program that requires heat Check that the heating is working by opening the front door and feel the heat If the above test points are in order the dryer is...

Page 22: ......

Page 23: ......

Page 24: ...www electrolux com professional Share more of our thinking at www electrolux com ...

Page 25: ...Home Laundry Equipment Ozone Laundry Systems Chemicals Services Special Offers Ex Rental Testimonials Contact Us about case studies contact 0845 077 65 65 ...

Reviews: