
21
ENGL
ISH
Power supply 380-415 V 3N
(standard configuration)
Figure 11 380-415 V 3N
Open the power supply terminal board and insert the
jumpers provided as follows: one jumper between termi-
nals 2 and 4 and another between terminals 4 and 6.
Using a suitable power supply cable (see technical data
table), connect the three phases to terminals 1, 3 and 5,
the neutral to terminal 6 and the earth wire to the termi-
nal .
Power supply 400-440V 3
Figure 12 400-440V 3
Open the power supply terminal board and insert the
jumpers provided as follows: one jumper between termi-
nals 2 and 4 and another between terminals 4 and 6.
Using a suitable power supply cable (see technical data
table), connect the three phases to terminals 1, 3 and 5
and the earth wire to the terminal
.
Power supply 220-230V 3
Figure 13 220-230V 3
Open the power supply terminal board and insert the
jumpers provided as follows: one jumper between termi-
nals 1 and 2, one between terminals 3 and 4 and
another between terminals 5 and 6. Using a suitable
power supply cable (see technical data table), connect
the three phases to terminals 1, 3 and 5 and the earth
wire to the terminal
.
F8
Energy control arrangement
The machine is arranged for external control of energy
consumption.
Figure 14 Energy control
Connect the energy peak controller across terminals
11 and 12 (Figure 14).
Safety devices
•
An automatic reset thermoamperometric protective
device incorporated in the windings of the electric
pump cuts off the electricity supply in the case of
malfunctioning.
•
In the event of water mains failure, a device pre-
vents water in the boiler from returning into the
mains.
Failure to comply with safety rules and regulations
relieves the manufacturer of all liability.
F9
HACCP arrangement
This machine is arranged for HACCP connection. Con-
nect the HACCP system to connector L3 on the base
of the machine.
L1
L2
L3
L1
L2
L3
L1
L2
L3
CAUTION
A normally open (n.o.) contact of the con-
troller must be connected across termi-
nals 11 and 12. When this contact closes
the boiler heating elements are discon-
nected. Using the dishwasher in these
conditions may increase the cycle time.
11
12
!
Summary of Contents for 506048
Page 32: ...34 ...