Revised July 29, 2019
LX2160 Owner's Manual
www.electro-mech.com · 800.445.7846
Page 17
MECHANICAL INSTALLATION
This section of the manual describes options for installing shot clock cabinets. If your
scoreboard project includes customizations or requires other special mounting
considerations, please contact Electro-Mech to request details specific to your project.
If you have unique requirements and would like to change the position or size of our
mounting hardware to accommodate them, we can probably help you out. But we need
to find out BEFORE we start building the cabinet. Let your scoreboard sales rep know
about any special needs as early in the process as possible.
Additional Materials and Tools
Most shot clock displays are installed on or near the structure supporting a basketball
goal. As illustrated below, each shot clock cabinet includes a set of mounting points in
the back and a set of mounting points on either side (brackets and posts not included).
These mounting points are simple and generic enough to accommodate a variety of
techniques for hanging the display on assorted structures. The rear mounting points
accept 1/2-inch 13 bolts and are provided for mounting structures that can run behind
the shot clock cabinet. In some cases, it may be easier to attach support pieces to the
sides of the shot clock cabinets. The side mounting points accept 3/8-inch 16 bolts.
Electro-Mech recommends you find a reputable sign installer with the equipment and
experience to handle the work mentioned above. If you are unfamiliar with sign
installers in your area, contact your scoreboard sales rep for recommendations.