07/29/2019
21
EI915
Start Up Inspection & Observations
Blower Delay/Control
– At the end of a cycle, the blower continues to run for approximately 30 seconds.
Advanced Installation & Special Equipment Concerns
G IN (T3) Tab –
Shorting this tab to “R” (24VAC HOT) at any time will cause this Make-Up Air unit to
turn on its blower (and open damper) without activating any external heat.
NOTE:
Blower speed upon connection of “G IN” to “R” will be
low CFM blower only
.
R IN NO NC
–dry set of contacts (SPDT) which follows the logic of this Make-Up Air unit’s
blower/damper. The intention of this is to drive an external blower whenever this unit is activated.
Example application
would be a scenario where the Make-Up Air is discharging in the return air
of a gas furnace: this contact would be used to energize the furnace blower when the Make-Up
Air is activated.
FAN ON (T5)
– Special output intended to be used by factory technician only. Terminal has 24VDC, do
not use.
Multiple Exhaust Fan/Blower Installation
CT terminal block (TB2) – located on the left side of the control module labeled “HI MED LO”. This
terminal block allows connection of up to 3 CTs, based on quantity of exhaust sources.
CT monitoring the “largest” exhaust source blower motor would connect to the inputs labeled “HI”
CT monitoring the “mid-sized” exhaust source blower motor would connect to the inputs labeled “MED”
CT monitoring the “smallest” exhaust source blower motor would connect to the inputs labeled “LO”
Information: CT terminal block (TB2)
Included with this product is one CT.
o
Additional CTs are available.
o
Additional CTs can apply to any of the three terminal block pairs.
Use only Electro Industries’ CTs designed for this product (part #3629).
Summary of Contents for EM-MC Series
Page 10: ...07 29 2019 8 EI915 Vertical Installation Wall Mount ...
Page 28: ...07 29 2019 26 EI915 ...
Page 29: ...07 29 2019 27 EI915 ...
Page 30: ...07 29 2019 28 EI915 ...
Page 31: ......
Page 32: ......