1 - INTRODUCTION
Please read carefully the instructions with this symbol before installing and using the instrument.
1.1 - STANDARDS and REGULATIONS
VIP ENERGY2K8
conforms to Directive 73/23/CEE (LVD) and 2004/108/CE (EMC).
It has been designed with reference to EN 61010-1, EN 61326 including append. A1/A2/A3, EN 61000-6-2, EN 61000-6-3,
EN 61000-3-2, EN 61000-3-3, EN 61000-3-3/A1, EN 61000-4-2, EN 61000-4-3, EN 61000-4-4, EN 61000-4-5, EN 61000-4-5/A1,
EN 61000-4-6, EN 61000-4-6/A1, EN 61000-4-8, EN 61000-4-8/A1,EN 61000-4-11, EN 61000-4-11/A1.
1.2 -
USER SAFETY
In order to preserve these safety conditions and ensure safe operation, the user must observe all instructions and marks
specified in this user manual. All maintenance and repair operations requiring the opening of the instrument must be carried
out only by suitably qualified and authorised personnel. The instrument was shipped from the manufacturing plant in
perfect technical safety conditions.
1.3 -
PRELIMINARY INSPECTIONS
Before installation, check that the instrument is in good conditions and was not damaged during transport. Check that the
network voltage and the rated voltage coincide. This instrument does not require an earth connection.
1.4 -
PRECAUTIONS IN THE EVENTS OF MALFUNCTIONS
When safe operation is no longer possible, put the instrument out of service and ensure that it cannot be operated
accidentally.
Safe operation cannot be guaranteed in the following circumstances:
·
When the instrument appears clearly damaged.
·
When the instrument no longer works.
·
After long storage in unsuitable conditions.
·
After being damaged in transit.
2
- CONNECTION OF THE INSTRUMENT
2.1 -
POWER SUPPLY
The power supply connections terminals are located on the rear side and are clearly indicated with the label POWER
SUPPLY. Use cables having a maximum section of 2.5 mm
2
. Earth connection is not required. Follow the connection
diagram at the beginning of the manual.
2.2 -
CONNECTING VOLTAGE MEASUREMENT CABLES
These cables, having a maximum section of 4 mm
2
, are to be connected to the terminals labelled VOLTAGE INPUT as
indicated in the diagrams at the beginning of the manual.
2.3 -
CONNECTING CURRENT MEASUREMENT CABLE
The instrument is able to measure up to 5A only through external C.T. The cables having maximum section of 4 mm
2
must
be connected to the terminals labelled CURRENT INPUT as shown in the diagrams at beging of the manual.
Use CT's with 5A secondary. Use cables having a section appropriate to the length of the connection and the rated power
of the CT's used.
Note 1: For safety reasons, never leave the CT secondary open.
Note 2:
Important
direct connections, without C.T. will damage the inputs.
3 MEASUREMENTS PAGES
At power on the
VIP ENERGY2K8
displays the last page selected before the power off . Use the PAG key to scroll through
the different measurements and the SEL key to see the details. See the diagrams at page 1, 2, and 3 for the measurements
pages. The presence of several pages is depending on the connection mode selected into the setup . [Fig.33].
3 PH-N = Three-phases with neutral, i.e. Star , 4 wires system
(Star)diagram page 1
3 PH
= Three-phases without neutral, i.e. Delta, 3 wires system (Delta)diagram page 1
2 PH
= Two-phases and neutral
(Diphase)diagram page 2
1 PH
= Single-phase and neutral
(Single-Phase) diagram page 3
[Fig. 1]
3 PH-N, 3 PH
=
Phase-neutral voltages VL1-N, VL2-N, VL3-N
2 PH
=
Phase-neutral voltages
VL1-N, VL2-N
1 PH
=