17
Operation manual VARION® C-POWER – S, M, M+ /
06.2019
Assembly
5.3
Assembly steps
Brief overview:
5.3.3 Positioning the generation unit
5.3.4 Screwing the control cabinet in position
5.3.5 Screwing the expansion tank connection block in
5.3.6 Connecting the generation unit
5.3.7 Connecting the temperature sensors
5.3.9 Connecting the control cabinet
5.3.10 Checking the connections
5.3.1 Preparing for assembly
A
Familiarise yourself with the assembly situation and the
documentation.
B
System
B
System components
B
Safety devices
B
Accessories
B
Installation location
B
Operation manual and supporting documents
A
Gather together the required tools and materials.
A
Keep the assembly area clear of objects than may get in
the way or be damaged.
A
Check that all of the installation location requirements
have been fulfilled.
D
“5.2 Installation location requirements” (page 13).
A
Ensure that the supply voltage has been and remains
disconnected. Only connect the supply voltage when
instructed in the respective assembly step.
If accessories (e.g. flue gas silencer, exhaust air kit) are
required for the assembly process:
A
Ensure that the accessory is correctly assembled and
ready for connection.
A
Ensure that the lines from the accessories have been laid
correctly and are accessible.
Manuals for accessories.
5.3.2 Unpacking the system
D
ATTENTION!
Risk of damage caused by improper handling.
The system may be damaged during unpacking or
transportation.
A
Do not cut through the protective packaging.
A
Keep objects that might damage the system away from it
(e.g. tools).
A
Remove the packaging material from the system.
A
Remove the parts included in the scope of delivery from
on top of the generation unit.
A
Check the system and all the parts it contains for
damage.
A
Check the scope of delivery according to the delivery
note for completeness.
If parts are missing or damaged:
A
Contact the manufacturer.
A
Remove the packaging material from the installation
location.
D