12
Operation manual VARION® C-POWER – S, M, M+ /
06.2019
Storage
4.
Storage
The system is prepared by the manufacturer for operation
on delivery. The system must be put into operation within
16 weeks following delivery. If that is not possible, the
system must be put into storage.
Storage of the system by the operator.
D
D
ATTENTION!
Risk of damage caused by improper storage.
During long periods of downtime, lubricants and liquids
settle within the system. Frost and damp conditions can
damage parts of the system.
A
Store the system in a frost-free, dry place.
A
Arrange for the manufacturer to rust-proof the system if
it is to be kept out of operation for more than 16 weeks.
When taking the system out of storage, the next steps must
be discussed with the manufacturer.
A
Contact the manufacturer.