![elco THISION WH Operation And Installation Manual Download Page 6](http://html1.mh-extra.com/html/elco/thision-wh/thision-wh_operation-and-installation-manual_2377084006.webp)
Safety Provisions
Conditions
It is a statutory requirement that all gas appliances are installed in accordance with the manufactures instructions and
all current regulations in force, all instructions should be fully read before installing or using the appliance.
All installations should be carried out by competent persons as described in the Gas Safety (Installation & Use)
Regulations. i.e. GasSafe registered and holding current certification.
The work must be carried out by a competent person as described in the I.S. 813 Domestic Gas Installations with
reference to the following codes of practices.
The Manufacturers instructions MUST NOT be taken in any way as overriding statutory obligations.
This boiler has been tested and certified to comply with all necessary European directives, latest building regulations
and efficiency requirements for the SEDBUK scheme and as been approved with an efficiency band rating of A and
is CE marked and complies with
92/42/EEC Efficiency of Hot Water Boilers Directive
90/396/EEC Gas Appliance Directive
93/68/EEC Low Voltage Directive (was 73/23)
92/31/EEC Electromagnetic compatibility Directive
I.S. 813 Domestic Gas Installations
The Thision WH should be installed in compliance with
The building regulations (Scotland-consolidated)
Building Regulations (Northern Ireland)
Building Regulations
Water fittings regulations or water bylaws in Scotland
Local water company bylaws
The boiler should not be modified in any way. Any modifications will invalidate the gas approval and invalidate the
warranty.
ATTENTION: High Voltage
Before opening the boiler casing for maintenance or servicing the 230VAC main supply to the boiler must be
disconnected!!
5
6
Summary of Contents for THISION WH
Page 1: ...Operation and Installation manual THISION WH 02 2011 DOC3078 12103187...
Page 2: ......
Page 4: ......