background image

Operation and Installation manual

 

 
 
THISION WH 

02/2011            DOC3078 / 12103187 

Summary of Contents for THISION WH

Page 1: ...Operation and Installation manual THISION WH 02 2011 DOC3078 12103187...

Page 2: ......

Page 3: ...0 21 Gas tightness check 21 Water heater shut down 21 Maintenance Checklist 25 Replacing the electrodes 25 Cleaning the condensate receptacle 26 Cleaning and refilling the syphon 26 Inspection of the...

Page 4: ......

Page 5: ...ollowing Euro pean standards 92 42 EEC Boiler efficiency directive 2009 142 EEC Gas appliance directive 2006 95 EEC Low voltage directive 2004 108 EEC EMC directive EN 483 Gas fired central heating bo...

Page 6: ...mply with all necessary European directives latest building regulations and efficiency requirements for the SEDBUK scheme and as been approved with an efficiency band rating of A and is CE marked and...

Page 7: ...pts the modulation ratio automatically to the heat demand required This is done by controlling the speed of the fan As a result the whirl wind mixing system will adapt the gas ratio to the chosen fan...

Page 8: ...A greater loss will cause a lower return temperature and therefore a longer loading period Legend P1 Loading Pump P2 Boiler Pump T1 Loading Temperature Sensor T2 Start Temperature Sensor T3 Shut Down...

Page 9: ...evel natural gas H E L max min 8 5 8 5 8 5 8 5 8 7 8 5 CO2 level liguid gas P max min NOx level mg kWh 39 39 39 CO level max min mg kWh 98 7 98 7 98 7 Max permissible flue resistance max min Pa 150 15...

Page 10: ...tput at 60 C 250L storage Continuous operation at 60 C 1st hour continous output at 60 C 500L storage 10 min peak output at 60 C 500L storage L 674 731 818 L 1542 1890 2413 L 1042 1390 1913 10 Electri...

Page 11: ...323 1483 1082 352 1578 1061 323 1483 1082 352 1 1 4 1 1 4 1 1 4 1 1 4 3 4 3 4 3 4 3 4 1 1 2 1 1 2 1 1 2 1 1 2 W B1 95 D H1 H1 mm 1952 1821 1952 1821 11 J K L M N mm mm mm mm mm J K L M N 1100 1000 800...

Page 12: ...ons 1 2 3 4 Condensate connection 5 After filling with water the syphon included in delivery should be installed to the connection 5 at the bottom of the water heater Connect the hose to the draining...

Page 13: ...nal regulations Construct the flue gas system as short as possible for maximum length see planner documentation Construct horizonal ways with a mini mum angle of 3 Air intake connection 8 The air inta...

Page 14: ...t whilst maintaining visibility iii Discharges at high level e g into a metal hopper and metal downpipe with the end of the discharge pipe is clearly visible tundish visible or not or onto a roof capa...

Page 15: ...Sizing of copper discharge pipe D2 for common T P relief valve sizes Schematic discharge pipe arrangement Unvented Applications Worked example of discharge pipe sizing The example below is for a G1 2...

Page 16: ...16 Cylinder Controls Electrical Connections...

Page 17: ...been eliminated close the outlet Step 4 Check pipework for leaks Further Commissioning Once the system has been completely filled and vented the unit can be connected to the electrical supply All DHWS...

Page 18: ...which gas type the boiler should be commissioned Condensate connection Remove the syphon 2 from the con densate connection Fill it with water and place it back in the original positi on Make sure the...

Page 19: ...s in the display Choose set up confirm with OK button now the boiler load can be changed by rotating the wheel C and confirming the 50 setting with the OK button After checking the combustion values s...

Page 20: ...ary correct the settings with the large adjustment screw at the top of the gas valve 3 Combustion check at 50 load An additional reference check of com bustion values at 50 load is recom mended in ord...

Page 21: ...electrical connection remo ved the restart will result in lockout no 133 When the connection is remade the restart will be successful Measuring the ionisation current can be done by mounting a multi m...

Page 22: ...1 sensor error 65 Room temperature 2 sensor error 70 Buffer storage tank temperature 1 sensor error 71 Buffer storage tank temperature 2 sensor error 72 Buffer storage tank temperature 3 sensor error...

Page 23: ...g temperature sensor error 324 BX same sensors 325 BX extension module same sensors 326 BX mixing group same sensors 327 Extension module same function 328 Mixing group same finction 329 Extension mod...

Page 24: ...less header address error 353 Common flow sensor B10 not available 371 Flow temperature 3 heating circuit 3 supervision 372 Limit thermostat heating circuit 3 373 Extension module 3 error collective e...

Page 25: ...n and ionisation electrodes Clean the condensate receptacle Clean and refill the syphon Inspect the combustion chamber clean if necessary DON T use water Check the water pressure of the sys tem Check...

Page 26: ...in the original position Inspection of combustion chamber For inspection of the combustion cham ber the mixing system and burner must be disassembled Switch off the boiler and close the gas supply Re...

Page 27: ...yzer for example Test points Bolt connections Gaskets of mixing system etc Safety devices Check the functionality and the settings of all safety devices connected Consult the chapter commissioning Che...

Page 28: ...p m u P Safety devices a W C g n i t t e s t i m i l h g i H ter flow sensor checked d e k c e h c r o s n e s s a g e u l F C g n i t t e s r e t i m i l p m e T Min gas pressure switch setting mbar...

Page 29: ...T lics Low velocity header Water pboiler kPa Plated heat exchanger Water flow m3 h Bypass boiler Pump setting Other Safety devices High limit setting C Water flow sensor checked Temp limiter setting...

Page 30: ...44 Leobersdorf ELCOTHERM AG CH 7324 Vilters ELCO Netherlands Rendamax B V NL 6465 AG Kerkrade ELCO Belgium n v s a B 1731 Zellik ELCO Italia S p A I 31023 Resana ELCO UK MHS Boilers ltd UK Basildon Es...

Reviews: