www.elationlighting.com
12
POWER LINKING
Max number of
ARENA ZOOM Q7IP™
units power linked together:
6units @120V
|
12 units @240V
u
NOTE: CAUTION WHEN POWER LINKING OTHER MODEL FIXTURES AS THE POWER
CONSUMPTION OF OTHER FIXTURES MAY EXCEED THE MAX OUTPUT ON THIS FIXTURE.
CLAMP MOUNTING
This fixture includes an adjustable mounting yoke and safety cable rigging point
attached to the fixture (see the illustration below). When mounting this fixture to truss,
be sure to secure an appropriately rated clamp (not included) to the yoke using an
M10 screw, and attach a
SAFETY CABLE
to the fixture safety cable rigging point
.
SAFETY CABLE
RIGGING POINT