![EL-CELL PAT-Press-Box User Manual Download Page 6](http://html1.mh-extra.com/html/el-cell/pat-press-box/pat-press-box_user-manual_2375062006.webp)
Page 6 of 10
User Manual
PAT-Press-Box
Release 1.0
3 Assembly and installation
Install the EC-Link datalogger software from the provided CD. For details see the manual
of the EC-Link Software.
With the provided cable, connect the docking station inside the temperature chamber to
the PAT-Press Box outside the chamber.
Connect the PAT-Press Box to the provided 24V power supply (wall adapter) and to an USB
port at your Windows PC.
Launch the EC-Link software
Connect your potentiostat to the PAT-Press Box using the cell cable of the potentiostat.
Prior to starting the electrochemical cycle, we recommend to wait for stabilization of the
recorded pressure, typically for at least 24 hours. Initial pressure change may be due to
temperature stabilization (typically within the first hour only), equilibration between liquid
and gaseous phases and creeping of the polymer seal which is placed between cell base
and lid.