- 7 -
STEP 1
EK recommends the use of EK-HFB 10 mm barb fittings and EK-Tube
ZMT 10/16 mm Matte Black tubing.
The INLET port is on the right side of the water block.
The installation of the CPU water block is now complete.
STEP 1
CLAMP
TUBING
EK-HFB 10 mm
BARB FITTING
INLET
PORT
FITTINGS AND TUBING
STEP 4
Align the water block properly on the motherboard, The screws are
not positioned in a square pattern.
Before proceeding with the installation, it is mandatory
to remove the protective foil from the backside of the
water block.
Start fastening two mounting screws at a time, preferably in a cross
pattern, and do not tighten them fully until all of them are partially
screwed in. Then - using the Allen Key 2.5 mm scrrew in all four
mounting screws until you reach the end of the thread.
STEP 4
MOUNTING SCREW
ALLEN KEY 2.5 mm
COILED SPRING
MAX TORQUE:
0.6 Nm