- 17 -
REPLACING THE TERMINAL (Optional Step)
With the EK-Quantum Vector FE RTX 3090 Ti water block, EK
provides one additional terminal. Follow these steps to install it.
STEP 1
Unscrew three (3) M4 x 27 DIN7984 terminal screws with the
enclosed 2.5mm Allen Key. Remove the terminal. Save the screws
and terminal gaskets.
For this step, you will need:
Allen Key 2.5 mm
STEP 1
TERMINAL
GASKETS
M4 x 27 DIN7984
DIRECT TERMINAL
STEP 3
After securing the backplate, place the backplate cover on the PCB
and make sure all holes are aligned. Position M3 x 12 DIN7991
screw in each of the three (3) mounting holes (as shown in the
image) and tighten them evenly with an Allen Key 2 mm.
Do not
use excessive force!
For this step, you will need:
Allen Key 2.0 mm
M3 x 12 DIN7991 Screw (3 pcs)
STEP 3
M3 x 12
DIN7991
BACKPLATE
COVER