eisenblatter PIPE-SNIPER Instruction Manual Download Page 4

6

8

7

5

4

2

3

1

PIPE  - SNIPER

®

Setting the required pipe diameter

 

Choose the correct position from 10 to 30mm for the pipe to 

be processed.

Tip: To change the setting quickly remove the belt from the 

mechanism beforehand.

1

2

3

Top quality synchronous 
mechanism consisting of gear 
wheels for wear-free pipe 
enclosure.

New aluminum lever makes 
enclosing the pipe extremely easy 
with minimum force.

By simply adjusting the clamping 

lever, the enclosure angle of the 
return rollers can be adjusted to 
any pipe diameter

4

Very compact, balanced design with 
a handle bar to reduce strain on the 

user and to allow grinding in any 
position.

8

Exclusive from  Eisenblätter:

 

Rubberised handle for optimal and 

safe handling

TIP

7

5

Easy to operate speed control; 
tacho-generator for constant 
speed even under load.

QUICK-LOCK cable release for a 
quick and easy change and for 
storage.

6

P I P E  B E L T  G R I N D E R

 

Details / Features:

Application / Handling:

www.eisenblaetter.de

Tel.: +49 - 8171 - 93 84 - 0    Fax: +49 - 8171 - 93 84 - 55

º

º

Maintenance cover allows carbon 
brushes to be easily accessed.

Summary of Contents for PIPE-SNIPER

Page 1: ...Instruction Manual PIPE SNIPER PIPE BELT GRINDER...

Page 2: ...nks to its sophisticated enclosure technology and innovative gas pressure damping system reduced strain on the user Speed Settings Easy speed adjustment by simply using the knurled knob on the handle...

Page 3: ...Prevent the build up of metal dust inside the machine by regularly blowing it out with an air compressor Gearbox The screws on the gearbox must not be loosened during the warranty period or this will...

Page 4: ...r the enclosure angle of the return rollers can be adjusted to any pipe diameter 4 Very compact balanced design with a handle bar to reduce strain on the user and to allow grinding in any position 8 E...

Page 5: ...ose the pipe the desired amount Important For safety guide the machine using both handles After grinding Important T Handle must be released before removing the machine Remove PIPE SNIPER from pipe TI...

Page 6: ...hod Delivery Time Order Date Customer No A S A P 2 Pick Up 1 DPD 3 Forwarding Not Urgent Total Price Signiture Subject to our delivery terms and conditions as of 11 08 Gerd Eisenbl tter GmbH Patented...

Page 7: ...Vi overtar ansvaret for at dette produktet er i overenstem melse med f lgende standarder eller standard dokumenter EN 60745 EN 55014 1 EN 55014 2 EN 61000 3 2 EN 61000 3 3 i samsvar med bestemmelsene...

Page 8: ...ct or if a guarantee is accepted for a specific property of the product 6 6 shall apply for compensation claims 6 Liability 1 Claims for compensation and for the reimbursement of expenses on the part...

Reviews: