EIPL TPC380 Owner'S Manual Download Page 5

 

 

 

 

Page 5 of 13 

Drawing   : - TPC380 
Issue 

: - 2 

Date 

: - 03/10/11 

 

OPERATION 

 

 

The  following  procedures  should  be  followed  to  test  the  ECO150  for  correct 
operation: 
 

 

1. 

After  unpacking,  examine  all  external  features  to  confirm  damage-
free shipment. Report all defects and damage at once.  Connect the 
power cable to a grounded electrical outlet. 

 
 

2. 

Check dehumidification process as follows: 

 

 

 

A.  Place unit on a level surface. 
B.  Start up unit by connection to mains supply and switching the on 

off switch to the ‘I’ position. 

C.   Check that the compressor is running. 

 

D.  Leave the machine running for 15 minutes. 
E.  Observe the evaporator coils through the evaporator filter panel 

 

i.  If the air temperature is below 80° F, an even coating of 

frost should cover the entire evaporator coil 

ii.  If the air temperature is above 80° F, frost and/or droplets 

of  condensed  water  should  cover  the  entire 
evaporator coil.  

  

F.

  After  continuous  running  time  of  approximately  55  minutes,  the 

unit  will  enter  “Hot  Gas”  defrost  mode  for  5  minutes  and  then 
automatically return to normal operation.

 

 

If, after carrying out the above procedures, the unit does not appear to 

function properly, refer to the 

Trouble Shooting

 section, which follows, 

or contact the Factory Service Center. 

 
 
 

 
 
 

After using the ECO150, turn it off for 5 minutes to allow the condensate on 
the coils to drain into the pump reservoir, then turn it back on and press the 
momentary purge switch for twenty to thirty seconds to evacuate the water 
from the pump reservoir.

TO ENSURE CONTINUED FULL EFFICIENCY OF THE 

DEHUMIDIFEIR, MAINTENANCE PROCEDURES SHOULD BE 

PERFORMED AS FOLLOWS: 

 

CAUTION: 

ONCE THE UNIT HAS BEEN SWITCHED OFF, WAIT AT 

LEAST FIVE MINUTES BEFORE RESTARTING. 

Summary of Contents for TPC380

Page 1: ...PC380 Issue 2 Date 03 10 11 ECO150 INDUSTRIAL DEHUMIDIFIER OWNER S MANUAL www eipl co uk To Buy Contact Sylvane at 800 934 9194 or visit www sylvane com For Product Support Contact Ebac Industrial Pro...

Page 2: ...2 of 13 Drawing TPC380 Issue 2 Date 03 10 11 UNIT PACKAGE CONTENTS Item Description Quantity 10531GR US Dehumidifier 1 3086144 Quick release hose coupling 1 3944110 PVC Tube 3 8 I D 7 8M TPC380 Manua...

Page 3: ...ent drain The cooled air then passes through the hot condenser coil where it is reheated using the same energy removed during the cooling phase plus the additional heat generated by the compressor The...

Page 4: ...used in products manufactured by Ebac Industrial Products Ltd is as follows R134a 1300 R407c 1610 For type and weight of refrigerant contained in this unit please refer to the product data label MODE...

Page 5: ...aporator coil ii If the air temperature is above 80 F frost and or droplets of condensed water should cover the entire evaporator coil F After continuous running time of approximately 55 minutes the u...

Page 6: ...frost coated across its surface At temperatures above 80 F the coil may be covered with droplets of water rather than frost Partial frosting accompanied by frosting of the thin capillary tubes indicat...

Page 7: ...he refrigerant compressor The charging stub should be crimped and rebrazed after servicing NEVER allow permanent service valves to be fitted to any part of the circuit Service valves may leak causing...

Page 8: ...nsufficient air flow 2 Compressor fault 3 Loss of refrigerant gas 1 Check all of the above 2 Contact the Factory Service Center 3 Contact the Factory Service Center Little or no defrost when required...

Page 9: ...sor 3944932 1 7 Run Capacitor 3030908 1 8 Solenoid Coil 3030453 1 9 Filter 2053119 1 10 Mains Lead 3031202 1 11 Fan Motor 3040262 1 12 Fan Motor Inlet Ring 3040254 1 13 Fan Motor Capacitor 3030893 1 1...

Page 10: ...WRITTEN OR IMPLIED WARRANTY WITH RESPECT TO THE FOREGOING DESCRIBED MERCHANDISE For Your Records Model ____________________ S N ______________________ Date Received ______________ SAVE THIS SECTION FO...

Page 11: ...Page 11 of 13 Drawing TPC380 Issue 2 Date 03 10 11...

Page 12: ...Page 12 of 13 Drawing TPC380 Issue 2 Date 03 10 11...

Page 13: ...8 662590 www eipl co uk sales eipl co uk American Sales Office Ebac Industrial Products Inc 700 Thimble Shoals Blvd Suite 109 Newport News Virginia 23606 2575 USA Tel 01 757 873 6800 Fax 01 757 873 36...

Reviews: