background image

6

6

6

6    

1

-800-497-4524                   EIC SOLUTIONS, INC

.

                       215-443-5190 

2.3  PREPARING THE ENCLOSURE 

To  mount  the  2500  Btu  unit  you  will  need  to  cut  an  opening  in  your  enclosure  and  drill 

mounting holes.  A cut-out drawing (see Appendix) showing the cut-out size and hole locations has 
been included in this manual (see Appendix).  The instructions for installing the air conditioner are 
printed below.   

TOOLS AND MATERIALS NEEDED: 

 

Pencil 

 

Tape Measure 

 

Jigsaw or suitable alternative 

 

Electric drill 

 

# 29 drill bit (.136”) (Not used for extension frame option) 

 

# 8-32 tap and tap handle (Not used for extension frame option) 

 

.203” drill bit (Extension frame option only) 

 

# 8-32 x 3/8” stainless machine screws (supplied) 

 

Nylon washers (supplied) 

 

One neoprene gasket (supplied) 

 
CUT THE OPENING AND DRILL MOUNTING HOLES IN THE ENCLOSURE 

1.

 

Using the guidelines provided in the installation manual choose an appropriate location for 
the air conditioner on your enclosure. 

2.

 

Layout the cut-out and hole pattern for the AC on the enclosure.  Refer to the Appendix.   

3.

 

Before  cutting  or  drilling  check  that  the  location  meets  the  clearance  requirements  as 
specified in the installation manual.   

4.

 

Using  a  pencil,  center  punch  or  other  method,  mark  the  exact  center  point  of  each 
mounting hole on the enclosure 

5.

 

Using the jigsaw, cut the opening in the enclosure. 

6.

 

Using the appropriate drill bit, drill a hole at each of the marks you made earlier. 

7.

 

Using the 8-32 tap, tap each of the holes you have drilled. (Non-Extension Frame Only) 

 

2.4  INSTALLING THE AIR CONDITIONER 

INSTALL THE AIR CONDITIONER 

1.

 

Lay the air conditioner down with the cold side (side with the thermostat) facing up. 

2.

 

Take the supplied gasket and lay it down on the flange. 

3.

 

Take one of the supplied mounting screws and, from the under side of the flange, push it up 
through the top right mounting hole, and through the hole in the gasket.  The gasket hole is 
undersized and will hold the screw in place.  Repeat this on the top left mounting hole.   

4.

 

Set the AC unit in the hole you’ve cut in the enclosure, and using a screwdriver, carefully 
start the two screws you attached to the gasket to the tapped holes in the enclosure.  Do 
not tighten these at this time. 

5.

 

Install  the  rest  of  the  screws  in  the  flange  placing  a  nylon  washer  on  each  fastener  and 
screw them into the tapped holes in the enclosure.  Do not tighten them completely. 

6.

 

Remove the two starter screws and place a nylon washer on each and reinstall. 

7.

 

Tighten all screws. 

 
 

 
 

Summary of Contents for AAC-151B Series

Page 1: ...lectric Air conditioner installation and operation manual FOR 2500 Btu MODEL S AAC 151B 4XT AAC 151B 4XT HC AAC 151B XXXXX Cooling Solutions for Cooling Solutions for Cooling Solutions for Cooling Solutions for Mission Mission Mission Mission Critical Electronics Critical Electronics Critical Electronics Critical Electronics ...

Page 2: ...7 2 6 APPLY POWER 8 3 OPERATION 3 1 THERMOSTAT SET POINTS AND HEATING COOLING UNITS 9 3 2 MAINTENANCE 9 4 SPECIFICATIONS 4 1 STANDARD SPECIFICATIONS 10 5 APPENDIX A STANDARD CUTOUT 11 B EXTENSION FRAME CUTOUT 12 EIC SOLUTIONS INC EIC SOLUTIONS INC EIC SOLUTIONS INC EIC SOLUTIONS INC 700 VETERANS WAY SUITE 200 WARMINSTER PA 18974 PHONE 1 215 443 5190 or 1 800 497 4524 FAX 215 443 9564 EMAIL info ei...

Page 3: ...e practical for real world applications and are now found in everything from consumer goods to spacecraft Your EIC Solutions Thermoelectric Air Conditioner operates on this principle so there is no compressor and no expensive ozone depleting CFC s EIC s air conditioners use Thermoelectric modules sandwiched between high performance aluminum heat sinks high CFM axial fans and a patented electronic ...

Page 4: ...osure See Figure 2 1 and 2 2 Vertically mounted mounted on the side of an enclosure 2500 Btu units are always mounted with the exposed heatsink fins facing left and right Fig 2 1 The unit cannot be mounted vertically and turned 90 degrees with the exposed heatsink fins at the top and bottom The AAC 151 4XT is equipped with a built in vertical condensate drip pan Once installed the drain hoses must...

Page 5: ...AL INSTALLATIONOF 2500 BTUUNITWITH INTERNALLYMOUNTEDDP 151HDRIP PANANDDRAINTUBE ENCLOSURE HOT SIDE OF AC OUTSIDE OF ENCLOSURE COLD SIDE OF AC INSIDE OF ENCLOSURE DRAIN TUBE COLD SIDE FANS HOTSIDE FANS COLD SIDE HEATSINK FINS HOTSIDE HEAT SINKS HOTSIDE HEAT SINKS COLD SIDE HEATSINK FINS ...

Page 6: ...stallation manual 4 Using a pencil center punch or other method mark the exact center point of each mounting hole on the enclosure 5 Using the jigsaw cut the opening in the enclosure 6 Using the appropriate drill bit drill a hole at each of the marks you made earlier 7 Using the 8 32 tap tap each of the holes you have drilled Non Extension Frame Only 2 4 INSTALLING THE AIR CONDITIONER INSTALL THE ...

Page 7: ...ded with the AC unit Review the Fig 2 3 below for suggested drain line configurations FIG 2 3 YOU MUST USE THE FACTORY INSTALLED HORIZONTAL DRIP PAN IF YOU INSTALL THE AIR CONDITIONER HORIZONTALLY FIG 2 2 ON THE TOP OF YOUR ENCLOSURE FAILURE TO DO SO MAY ALLOW CONDENSATE TO DRIP IN AN UNCONTROLLED MANNER CAUSING DAMAGE TO YOUR EQUIPMENT ...

Page 8: ... Wire colors are as follows Black or Brown line White or Blue line neutral Green or Green Yellow ground Amperage for 120 VAC unit is 11 8 amps Amperage for 220 VAC unit is 6 3 amps Upon applying power to the air conditioner the fans on the cold side inside the enclosure will come on The hot side fans outside the enclosure may also run depending on where the thermostat is set The cold side fans alw...

Page 9: ...Thermoelectric Air Conditioners are virtually maintenance free The only time maintenance is required is when a unit is installed in an extremely dirty environment In these cases the hot side heat sinks outside the enclosure should be inspected regularly for a build up of dust or dirt If a build up is present on the heat sink fins it can be easily removed as follows 1 Disconnect the power from the ...

Page 10: ...t Voltage Range 100 264 V Current 11 8 6 3 A Heating Capability HC Units Only 2700 BTU hr 800 W Weight 33 kg 72 lbs NEMA Rating 4X Cold Side Airflow 180 cfm 305 m3 hr Hot Side Airflow 250 cfm 425 m3 hr Sound Level at 1 meter 75 dBA Operating Temperature Range 4 to 140 F 20 to 60 C Storage Temperature Range 4 to 185 F 20 to 85 C Cooling Thermostat Accuracy 1 0 F 0 6 C ...

Page 11: ...11 11 11 11 1 800 497 4524 EIC SOLUTIONS INC 215 443 5190 APPENDIX A Enclosure cutout for 2500 BTU air conditioner NON EXTENSION FRAME Holes to be 8 32 TAP ...

Page 12: ...12 12 12 12 1 800 497 4524 EIC SOLUTIONS INC 215 443 5190 APPENDIX B Enclosure cutout for 2500 BTU air conditioner EXTENSION FRAME ONLY Holes to be 203 ...

Reviews: