6.2 Chassis Grounding 

 
In this section, “Chassis Ground” is referred to as “ground” or “grounding” unless otherwise mentioned. 
The PCS  cabinet is  shipped  with ungrounded DC power terminals within the inverter. When  terminated  to the 
batteries, the DC bus is configured for DC negative to ground. 
 
AC Grid Earthing System: The AC power grounding is achieved through the PE terminals of the AC grid connectors 
on the AC Filter Board, as shown in section 6.1.  The PCS is configured by default for a TN earthing system.   
 

Note: The field ground wire rating applies to the AC circuit only

.  The DC source loop is internal to the battery 

cabinet, and is rated accordingly. 
 
DC  ground  fault  monitoring:    The  Evolve  BESS  provides  integrated  DC  earth  fault  monitoring,  and  provides 
indication on the PCS panel as shown in section 12.2. 
 
Lightning  Grounding:  The  inverter  has  built-in  lightning  protection.  In  order  for  the  lightning  protection  to  be 
effective, the grounding for lightning currents must be provided via low impedance path from the PCS PE terminal 
to the building Ground/Earthing point. 

7  Energy meter installation 

 

The energy management system’s solar self-consumption algorithm requires the connection of an energy meter at 
the customer’s main electrical panel.  The meter must be installed and configured according to the electrical service; 
either  single  phase  or  three  phase.    The  information  covered  in  this  guide  is  generic  to  the  approved  list  of 
integrated energy meters that are supported by the home storage system at the time of your purchase.  Refer to 
the  energy  meter  manufacturer’s  installation  manual  supplied  with  your  system  for  full  installation  details  and 
safety information. 

 

Note:  Refer to Appendix B  for wiring diagrams specific to the manufacturer and model of the energy 
meter supplied with your system. 

 

The energy meter is supplied inside the PCS cabinet. It can be relocated within or adjacent to the main electrical 
panel to simplify the current and voltage wiring. Energy meters supplied with the home storage system are DIN 
rail mounted.  Use existing DIN rail space within the electrical panel, or add DIN rail as required. 

 

7.1 Electrical connections – voltage measurement / power supply 

 
The energy meter provided is line powered from the electrical service.  An in-line fuse,  rated  1 Amp / 250 VAC, is 
required on the voltage line input to the meter.  For three phase service, fuses are required on the V1, V2, and V3 
input terminals. The voltage inputs can be connected anywhere on the customer side of the main service disconnect 
breaker. For three phase systems, phase rotation is automatically configured by the meter. 

7.2 CT (current transformer) connections 

 
Note: Observe the current flow direction of the CT.  The direction of flow must be away from the utility 
meter.   For three phase systems, phase rotation is automatically configured by the meter. 
 

CAUTION! Handle CTs with care.  Always terminate the CTs at the meter inputs prior to clamping the 
core onto a hot wire. 
 

Summary of Contents for Evolve ESS AU 13

Page 1: ...lve ESS AU 13 kWh Evolve ESS AU 26 kWh Evolve ESS AU 39 kWh Grid Support Utility Interactive Inverter Integrated Lithium Battery For use only with battery model LG Chem EM048126P3S7 Installation Start...

Page 2: ...Revision History Revision Date Status Author Comments 1 0 05 Oct 2022 Released RWM Initial release...

Page 3: ...AC Grid output circuit CAUTION This equipment contains high energy lithium batteries Qualified and trained personnel should wear protective clothing and equipment when working inside the battery cabin...

Page 4: ...ATTERY BMS TO PCS COMMUNICATION CONNECTION 11 6 SYSTEM ELECTRICAL WIRING 11 6 1 AC POWER CONNECTIONS 12 6 2 CHASSIS GROUNDING 13 7 ENERGY METER INSTALLATION 13 7 1 ELECTRICAL CONNECTIONS VOLTAGE MEASU...

Page 5: ...THERMAL PERFORMANCE CHARGE DISCHARGE CURVES 22 APPENDIX A ELECTRICAL BLOCK DIAGRAM OF INTER CABINET WIRING 23 APPENDIX B ENERGY METER WIRING DIAGRAMS 24 B 1 ACCU ENERGY ACUREV 1310 24 B 1 2 A Main el...

Page 6: ...he fire department or other required emergency response team Evacuate the area and if applicable follow your emergency evacuation plan if others are in proximity to the installed location In case of f...

Page 7: ...ration and hazards Only connect this product to a compatible electrical service as defined in the model specifications This product must be connected to a dedicated branch circuit in the main electric...

Page 8: ...either via CT monitoring or via compatible communication protocols with a select list of PV inverter models Consult Eguana Technologies for the most recent list of PV inverters with direct communicati...

Page 9: ...J 45 crimp tool EMS to PCS communication cable and RJ 45 connectors M8 mounting hardware for wall bracket load bearing 2 5 Inverter DSP Firmware Version The Inverter DSP firmware version is displayed...

Page 10: ...Refer to the environmental ratings in section 16 2 of this manual CAUTION Do not install in direct sunlight Battery performance is dependent upon operating ambient temperature Radiant heat absorbed i...

Page 11: ...is connected to the backup circuit 2 The example above is shown with the energy meter relocated from the PCS to the main electrical panel For installations where the energy meter is located within the...

Page 12: ...urces Overcurrent protection devices RCD Type A 300 mA are sufficient for protection of both AC Grid and AC load ports 7 Total AC nameplate of PV not to exceed 5 kW String inverter shown for simplicit...

Page 13: ...g nut are mounted from inside the cabinet 4 Mount the leveling bracket to the cabinet CAUTION Battery cabinet is heavy Mechanical lift recommended 5 Lift the battery cabinet onto the wall mount bracke...

Page 14: ...left until mating to the gasket 14 Place the coupling plate inside the PCS cabinet and insert the four mounting bolts and washers through to the battery cabinet side 15 Place star washers on the bolts...

Page 15: ...rque can result in an arc fault hazard and risk of fire Damage as a result of improper termination is not covered by the manufacturer warranty 1 Remove the plastic safety barrier on the power panel as...

Page 16: ...hotovoltaic inverter Wiring methods must be in accordance with local electrical codes The installer is responsible for ensuring that over current protection is installed and sized appropriately for th...

Page 17: ...ranch circuit over current protection in accordance with local electrical codes WARNING Improper connection of the wiring panel may result in equipment damage and cause personal injury Disconnect all...

Page 18: ...vered in this guide is generic to the approved list of integrated energy meters that are supported by the home storage system at the time of your purchase Refer to the energy meter manufacturer s inst...

Page 19: ...ded for reliable communication access to the system The Ethernet wiring from the battery system must be connected to a customer supplied router A permanent Ethernet connection to the battery system re...

Page 20: ...on 1 Remove the front cover from the battery cabinet adjacent to the PCS cabinet 2 Press the Power button see above label 8 on the master battery module The master battery module has communication wir...

Page 21: ...and PCS Refer to table in section 12 2 for definitions of the indicator status of the PCS 4 Turn ON the AC breaker at the main electrical panel to the PCS 10 1 Shutdown Sequence 1 Press and hold the s...

Page 22: ...to normal operation using the service button Note It is recommended to login to the EMS via web browser and retrieve the service code from the system prior to attempting to clear the service mode Refe...

Page 23: ...xtension cords connected to a backup circuit should be limited to 10 meters IMPORTANT This product does not support automatic gas generator integration Do not attempt to connect a gas generator to the...

Page 24: ...rials to clean the unit Never remove or unplug connections or plugs during cleaning 14 Troubleshooting System faults are reported and logged in the monitoring system All fault logs are also accessible...

Page 25: ...e anti islanding method Sandia frequency shift Protective Class I II or III Class I Over Voltage Category OVC I II III or IV OVC III Inverter topology type Isolated Electrical data DC Nominal DC Volta...

Page 26: ...les 103 kg Installation type Wall mount upright Environmental data Ingress protection rating IP34 Pollution Degree 3 Cooling method Natural convection Ambient temperature relative humidity altitude 10...

Page 27: ...ing AC Power Derating Full Range Derated 15 to 45 C 10 C 10 C 50 C 0 1000 2000 3000 4000 5000 6000 0 10 20 30 40 50 60 70 80 90 100 AC POWER VA SOC Evolve ESS AU Discharging AC Power Derating Full Ran...

Page 28: ...ery to PCS BMS CAN port A2 801003533 BMS cable short Interconnects modules within same cabinet A3 801003247 BMS cable long Interconnects modules between cabinets A4 Battery power cables Positive negat...

Page 29: ...S 485 Communication to the EMS B 1 2 A Main electrical panel meter CT and power wiring B 1 2 B PV meter CT and power wiring ESS ESS Home loads L1 L2 L3 L1 L2 L3 Figure 18 EMS to Acurev 1310 energy met...

Page 30: ...25 B 2 Eastron SDM630MCT 40mA RS 485 communication wiring CT wiring Voltage sense wiring EMS panel electrical block diagram...

Page 31: ...INSTALLATION NOTES...

Page 32: ...Eguana Technologies Inc Doc 68118 Rev1 2022...

Reviews: