Eguana Evolve 0513 ESS Owner'S Manual Download Page 9

 

 

IMPORTANT!  Surge rated loads, ie) power tools, portable air conditioners,  may cause an overload 
shutdown.  Equipment of this type that is connected to the backup panel should be inspected and tested 
regularly as per manufacturer suggested schedules.  Permanent damage to the battery system and/or your 
equipment may occur if exposed to chronic overloading cycles. 
 
IMPORTANT!  Portable extension cords connected to a backup circuit should be limited to 10 meters.   
 
IMPORTANT! This product does not support automatic gas generator integration.  Do not attempt to 
connect a gas generator to the battery system.  If generator support is required, consult your installer 
regarding a separate manual transfer to your backup electrical panel. 
 
NOTE:  The power output / surge rating will be further limited when the battery is below 10% SOC. 
 

5.1 Backup power display modes. 

Display 

Definition 

 

Battery status LEDs indicate the following: 

 

Charge = flash right.   Discharge = flash left. 

 

PCS and service lights off. 

 

 
Low SOC shutdown in backup mode.  See section 5.2 to restart the system. 

 

 

 

 
Low SOC shutdown initiated while out of service.  See troubleshooting – section 7, 
“service light on in backup mode”. 

 

 

 

5.2 Restarting the battery system after low battery shutdown 

 
The system will shutdown when the battery reaches a critically low level during backup operation. 
 
To restart the system: 
 
IMPORTANT!  Ensure there is adequate sunlight for the solar PV system to charge the battery before 
restarting the system.
  If the battery system is installed without a PV system connected to the backup 
panel, do not attempt to restart the system. Wait for the utility power to return.  
 

1.

 

Press and hold the service button for 5 seconds. 

 
 
The backup power will restart, allowing the PV system to reconnect* and begin charging the battery.  The 
system will continue to operate if the battery charges to its minimal normal operating range.  If the battery 
does not charge within 15 minutes of restart, the system will shut down to preserve the battery. 

*PV system reconnect time is approximately 5 minutes. 

 
Note:  If necessary, the load circuits can be shut off inside the backup panel to increase the battery charge 
rate.  Do not shut off the PV circuit. 

Summary of Contents for Evolve 0513 ESS

Page 1: ...DO 58159 Evolve ESS Owner s Manual...

Page 2: ...Evolve documents please visit our website at www eguanatech com WARNING Read this document in its entirety before using this product Failure to follow instructions or warnings can result in electrica...

Page 3: ...1 OVERVIEW 3 3 SYSTEM MONITORING 4 3 1 SETTING THE EMERGENCY RESERVE CAPACITY 4 4 OPERATION 5 4 1 LED DISPLAY INDICATORS 5 4 2 LED DISPLAY DEFINITIONS 5 5 BACKUP POWER OPERATION 5 5 1 BACKUP POWER DI...

Page 4: ...e installed location In case of fire When safe use a fire extinguisher suitable for use including A B and C dry chemical fire extinguishers or carbon dioxide extinguishers Do not use type D extinguish...

Page 5: ...rical panel Ensure proper electrical grounding in accordance with code requirements CAUTION Both AC and DC voltage sources are terminated inside this equipment Each circuit must be disconnected before...

Page 6: ...onsists of two main components 1 Evolve ESS includes the power control system PCS and the battery 2 Evolve Hub includes equipment which connects the monitoring system to the home s internet connection...

Page 7: ...utility supply is operating either through a time of use plan or via a solar self consumption plan While in this operating mode the battery capacity s default partition will assign 75 of the battery...

Page 8: ...f the loads connected to the system and the availability of the solar PV supply This system is designed to reliably provide power to a refrigerator home lighting home electronics and small appliances...

Page 9: ...hutdown in backup mode See section 5 2 to restart the system Low SOC shutdown initiated while out of service See troubleshooting section 7 service light on in backup mode 5 2 Restarting the battery sy...

Page 10: ...Green LEDs reduce the load by shutting off circuits in the backup electrical panel then press and hold the service button 5 seconds to resume backup power operation If the battery low SOC shutdown mod...

Page 11: ...ake a warranty claim Record of purchase including date of installation installer name and contact details Serial numbers for the EMS and Battery System cabinets PCS Battery EMS gateway UID this is the...

Reviews: