background image

 

1 Safety 

 
Throughout this manual, the following symbols will be used to highlight important information and procedures: 

 

Symbol 

Definition 

Symbol 

Definition 

 

 

WARNING! A dangerous voltage or other 
condition exists. Use extreme caution 

when performing these tasks. 

 

 

Login to the remote monitoring 

system for operating status 

 

CAUTION! This information is critical to the 

safe installation and or operation of the 
inverter. Follow these instructions closely. 

 

 

 

NOTE: This statement is important. Follow 
instructions closely.
 

 

 

 

 

 

 

1.1 In case of emergency 

 

In all cases: 

 

If safe to do so, switch off the AC breakers (external to the system) for the system. 

 

Contact the fire department or other required emergency response team. 

 

Evacuate the area, and if applicable, follow your emergency evacuation plan if others are in proximity to the 

installed location. 

 
In case of fire: 

 

When safe, use a fire extinguisher suitable for use; including A, B, and C dry chemical fire extinguishers or 

carbon dioxide extinguishers. 

 

In case of flooding

 

Stay out of water if any part of the system or wiring is submerged. 

 

Do not attempt to operate batteries that have been submerged in water even after they have been dried. 

 

In case of unusual noise, smell or smoke: 

 

If safe to do so, ventilate the area. 

 

 

1.2 Battery module safety precautions 

 

This product is integrated with LG Chem EM048126P3S7 series battery modules.  Refer to the LG Chem product manual 

LG Chem P3S series 48V Standalone Battery Module Installation Manual, for complete safety instructions regarding 

handling of battery modules.  

 

 

1.3 General safety precautions

 

 

Important!  Installation, service, and operating personnel must read this document in its entirety, and observe all safety 

and installation procedures as described in this manual.  Never operate system in a manner not described by this manual. 

 

Only qualified personnel should service this product. 
 

Ensure all covers are securely fastened after installation is complete.   

 

Personal Protective Equipment (PPE) in compliance with local work place safety standards must be worn when working 

inside the cabinet. 

 

EMS 

Summary of Contents for Enduro 0307

Page 1: ...67020Rev3 Enduro 0307 Installation Startup Guide...

Page 2: ...g inside the battery cabinet and or with battery modules This product is compatible with the LG Chem battery model EM048126P3S7 only CAUTION The battery provided with this system must be charged only...

Page 3: ...L DATA 10 APPENDIX A ESS CONFIGURATION WITH EASTRON DIRECT CONNECT ENERGY METERS 11 A 1 EMS KIT CONTENTS 11 A 2 OPTIONAL PV METER KIT CONTENTS 12 A 3 ESS SYSTEM PLANNING AND CABLE ROUTING IDENTIFICATI...

Page 4: ...extinguishers or carbon dioxide extinguishers In case of flooding Stay out of water if any part of the system or wiring is submerged Do not attempt to operate batteries that have been submerged in wat...

Page 5: ...Risks of Damage This system is compatible with the LG Chem battery model EM048126P3S7 only Do not attempt to connect any other battery to the system Do not connect any other loads directly to the batt...

Page 6: ...on algorithm to operate This product can supply limited backup power via an on board 10A power outlet 2 2 Glossary 2 3 Special tools hardware In addition to standard tools the following tools and mate...

Page 7: ...ation regarding direct connect meters or Appendix B for CT connection type meters 3 Installation Site Preparation Before installing the ESS components read all instructions and warnings in this manual...

Page 8: ...top edge of the mounting bracket 2 Pull the ESS away from the mounting location and remove the mounting bracket 3 Using a level or straight edge for reference position the mounting bracket on the wall...

Page 9: ...SS frame aligning the brackets as shown right 4 Secure the battery module using the two mounting screws provided 5 2 Power cable connection CAUTION Observe the polarity of the battery power connection...

Page 10: ...as shown right 2 Terminate the Line N and Protective Earth PE wires at the AC Grid terminal block 6 2 Supported earthing systems This product can be connected to electrical networks with either TT or...

Page 11: ...ncludes startup surge of motor type loads 2 Extension cords connected to the outlet should not exceed 10 meters in length 3 Do not connect the outlet to permanently wired electrical circuits for examp...

Page 12: ...ower operation If the battery low SOC shutdown mode is displayed not attempt to resume backup operation Wait for grid power to return All panel lights flashing System is attempting to communicate with...

Page 13: ...IV OVC III Pollution degree 3 PCS general data Width x Height x Depth 539 mm x 1236 mm x 231 mm Weight including battery 96 kg Protection type IP21 Ambient temperature relative humidity altitude 10 C...

Page 14: ...ter Direct Connect 6 1 DIN rail ground terminal block 7 1 Power adapter EMS 8 1 3424 EMS USB cable 0 3m 9 1 3414 Energy meter communication cable 2m 10 1 USB to Ethernet adapter 11 2 3516 EMS to ESS c...

Page 15: ...with direct software integration to the EMS Refer to section A 6 for the installation procedure Figure 14 PV meter kit contents optional for PV inverters without software integration to the EMS Ref Qt...

Page 16: ...ect meters are rated maximum 100 Amp and configurable for 1 or 3 phase electrical service Three phase shown 3 PV energy meter supports 1 and 3 configurations where applicable It is recommended that A...

Page 17: ...inate the pigtail end of the 3414 cable to the RS 485 port of the energy meter as shown in the table below Wire color Signal Green White Ground G Blue A Blue White B 7 Connect a 3424 cable from the Ma...

Page 18: ...inate the 3424 USB cable to the port labelled PV on the top side of the EMS to the USB port of the 485 adapter on the PV kit 3 Connect the RJ 45 end of the 3414 cable to the 485 adapter as shown in fi...

Page 19: ...Main Electrical Service A 8 Eastron SDM630 Direct Connect 1 phase 3 phase meter to PV Inverter Figure 20 Eastron direct connect meter wiring diagram main electrical service Figure 21 Eastron SDM630 di...

Page 20: ...meter 6 1 DIN rail ground terminal block 7 3 CTs 3 ph mains metering use only 1 CT for single phase installs 8 1 3414 Energy meter communication cable 2m 9 2 3424 USB Adapter to EMS USB cables 0 3m 1...

Page 21: ...ect software integration to the EMS Figure 23 PV meter kit contents optional for PV inverters without software integration to the EMS Ref Qty Description 1 1 Din rail 2 2 Din rail end stop 3 1 RS485 a...

Page 22: ...2 Home energy meter supports 1 and 3 configurations where applicable Observe CT direction as shown 3 PV energy meter supports 1 and 3 configurations where applicable Observe CT direction as shown It i...

Page 23: ...adapter as shown in figure 25 3 ESS Connect the 3516 cable to the RS 485 port as shown in figure 26 4 Connect the RJ 45 end of the 3414 cable to the 485 adapter as shown in figure 25 5 Terminate the...

Page 24: ...r below the EMS kit 2 Terminate the 3424 USB cable to the port labelled PV on the top side of the EMS to the USB port of the 485 adapter on the PV kit 3 Connect the RJ 45 end of the 3414 cable to the...

Page 25: ...at the meter inputs prior to clamping the core onto a hot wire Note Observe the CT direction and wiring polarity for proper operation of the system B 8 Accu Energy Acurev 1310 3 phase meter PV Inverte...

Page 26: ...er adapter EMS 8 1 3424 EMS USB cable 0 3m 9 1 3414 Energy meter communication cable 2m 10 1 USB to Ethernet adapter 11 2 3516 EMS to ESS communication cable 10m Home internet connection cable 10m 12...

Page 27: ...ection C 6 for the installation procedure Figure 32 PV meter kit contents optional for PV inverters without software integration to the EMS Ref Qty Description 1 1 Din rail 2 2 Din rail end stop 3 1 R...

Page 28: ...AC adapter that plugs into an AC outlet 3 The PV energy meter option shown applies to PV inverters that are not supported with software integration to the EMS The PV energy meter supports 1 and 3 conf...

Page 29: ...Terminate the pigtail end of the 3414 cable to the RS 485 port of the energy meter as shown in the table below Wire color Signal Green White Ground G Blue A Blue White B 13 Connect a 3424 cable from...

Page 30: ...the 3424 USB cable to the port labelled PV on the top side of the EMS to the USB port of the 485 adapter on the PV kit 3 Connect the RJ 45 end of the 3414 cable to the 485 adapter as shown in figure...

Page 31: ...phase meter to Main Electrical Service C 8 Eastron SDM630MV CT 1 phase 3 phase meter to PV Inverter Figure 38 Eastron CT type meter wiring diagram main electrical service Figure 39 Eastron CT type met...

Page 32: ...29 This page intentionally left blank...