background image

8

5. Cleaning and maintenance

 

ƒ

Entrance areas must be fitted with a properly sized clean-off zone / doormat.

 

ƒ

In commercial applications where the laminate flooring area leads directly outside, an appropriately sized clean-off zone must be 
built into the floor structure.

 

ƒ

Attach felt pads to the feet of furniture, including chairs and tables. Clean these regularly, check for proper functionality, and 
replace if required.

 

ƒ

Lift furniture when moving, rather than pushing or dragging.

 

ƒ

Use soft furniture castors (type W) in the case of office chairs and all other objects on castors. Clean office chair and furniture 
castors regularly, check for proper functionality and replace if required.

 

ƒ

Wipe any stagnant moisture / liquids from the laminate flooring immediately.

 

ƒ

Steam cleaners should not be used, with the exception of Aqua+ Laminate Flooring.

 

ƒ

Only clean the laminate floor with a damp cloth.

 

ƒ

Never use abrasives or scouring agents on the laminate floor.

 

ƒ

Do not use cleaning products that may leave a residue. We recommend our system-related flooring cleaner Clean-it from EGGER.

 

ƒ

Waxing and/or polishing is neither necessary nor permitted.

 

ƒ

Subsequent surface sealing of EGGER Laminate Flooring is not necessary and not permitted.

 

ƒ

Use the hard floor nozzle (brush accessory) when vacuum cleaning.

No matter how hard-wearing your floor is, a laminate floor board may still get damaged. If the damage is slight, the problem can be 
easily solved with EGGER’s system-related repair paste Decor Mix & Fill. If the damage is more serious, a professional installer will 
be able to replace an entire panel. Separate instructions are available upon request.
For special installation instructions, for example how to deal with stairs, or other questions, please contact your retailer for expert 
advice.

Cleaning and maintenance

Summary of Contents for JUSTclic!

Page 1: ...Installation instructions Egger Laminate Flooring with JUSTclic installation system...

Page 2: ...e of fast setting screed the measurements and limitis specified by the respective manufacturer shall apply The test material must be obtained from the lower one third of the screed During this process...

Page 3: ...cting the function of the floor heating cooling system functional heating cooling Proof of the proper raising and lowering of the temperature of the heated screed structure in any season must be provi...

Page 4: ...nate flooring with laminated Silenzio underlayer board on the reverse An additional insulation underlay is not permitted in this case 3 Before the installation Acclimatisation of the floor boards The...

Page 5: ...observing the required gaps placing the spacers Figure 3 to 10 Start installing the 2nd row with the remaining panel of the 1st row if the latter is at least 200 mm long In the following rows the new...

Page 6: ...to the top of the tongue on the short and long edge The glue should ooze out along the complete long and short edge after the panels have been connected together Excess sealing glue is easy to remove...

Page 7: ...an then be pushed horizontally over the groove of the previously installed panel This connection area has to be glued with a PVAC glue If you have a door frame that cannot be shortened e g one made of...

Page 8: ...exception of Aqua Laminate Flooring Only clean the laminate floor with a damp cloth Never use abrasives or scouring agents on the laminate floor Do not use cleaning products that may leave a residue...

Page 9: ...41 301 20222 flooring egger com EGGER Drevprodukt Gagarin Ezhvinsky proezd 1 215010 Gagarin Oblast Smolensk Russia T 7 48135 79 300 F 7 48135 79 311 info ru egger com BR_flo_EGGER_installation_instruc...

Reviews: