Installation instructions

Egger Laminate Flooring  

with JUST clic! installation system

Summary of Contents for JUSTclic!

Page 1: ...Installation instructions Egger Laminate Flooring with JUSTclic installation system...

Page 2: ...e of fast setting screed the measurements and limitis specified by the respective manufacturer shall apply The test material must be obtained from the lower one third of the screed During this process...

Page 3: ...cting the function of the floor heating cooling system functional heating cooling Proof of the proper raising and lowering of the temperature of the heated screed structure in any season must be provi...

Page 4: ...nate flooring with laminated Silenzio underlayer board on the reverse An additional insulation underlay is not permitted in this case 3 Before the installation Acclimatisation of the floor boards The...

Page 5: ...observing the required gaps placing the spacers Figure 3 to 10 Start installing the 2nd row with the remaining panel of the 1st row if the latter is at least 200 mm long In the following rows the new...

Page 6: ...to the top of the tongue on the short and long edge The glue should ooze out along the complete long and short edge after the panels have been connected together Excess sealing glue is easy to remove...

Page 7: ...an then be pushed horizontally over the groove of the previously installed panel This connection area has to be glued with a PVAC glue If you have a door frame that cannot be shortened e g one made of...

Page 8: ...exception of Aqua Laminate Flooring Only clean the laminate floor with a damp cloth Never use abrasives or scouring agents on the laminate floor Do not use cleaning products that may leave a residue...