Setting
V
for
(* /LWKLXP%DWWHULHV0DVWHU6ODYH
1). Dip Switch: There are 4 Dip Switches
which
set different baud rate
s
and battery
group address
es
. If switch position is turned to the “OFF” position, it means “0”. If
switch position is turned to the “ON” position, it means “1”.
x
Dip 1
, 2, and 3 are in the
“O
N
”
position
*on = down
x
Dip 4
is in the "OFF"
position
*off = up
x
The 1-3 "ON" & 4 "OFF"
configuration is to indicate
Master battery status and
is reserved for
communications with the
inverter.
x
A Max of 16 batteries can
communicate in a single
battery bank using
different dipswitch
addresses.
(*//%DWWHU\
x
Dip 1
, 2, 3, and 4 are in the
“O
FF
”
position
*off = down
x
The ALL "OFF" position is to
indicate the Master battery
status and is reserved for
communications with the
inverter
x
A Max of 16 batteries can
communicate in a single
battery bank.
(*/LIH3RZHU%DWWHU\
3OHDVH1RWH,I\RXFKDQJHWKHGLSVZLWFKHV\RXPXVWSRZHUF\FOHWKHEDWWHULHV
IRUWKH%06WRUHFRJQL]HWKHQHZGLSVZLWFKDGGUHVV
2).
Installation
Step 1. Use the RS485 cable to connect
UIF
inverter and Lithium battery as Fig 1.
Step 2. Switch on
the
battery
breaker/s
.
Step
3
.
Turn
on
the
inverter.
Step
4
.
S
elect
battery
type
as
“
EG4
”
in
LCD
program
5
for the Master inverter. For other paralleled
inverters, you must set to "USE"
.
If communication between the inverter and battery is successful, the battery icon
on LCD display will
flash
(*(OHFWURQLFV
ZZZHJHOHFWURQLFVFRP
35
127(
For EG4-LL ensure the red power switch is set to "ON" as well as the breaker.
127(
Even with the EG4 batteries having built-in breakers, a minimum 150A in line breaker is required, and a 200A
in line breaker is recommended.
127(