UP2500
| Manual
14
4.
Installation and operation
4.1 Package Items
Unpacking and check the Packing List
1)
For battery module package:
Two power cables and one communication cable for each battery package:
Grounding cable
:
Two long power cables (max. current capacity
120A
) and one communication cable for each energy storage
system:
180
180
210
1000