E F A P O W E R E V - Q C 4 5 - I N S T A L L A T I O N A N D U S E R M A N U A L
11 | 32
5.3
HANDLING AND PLACING
Before installing stations
The instructions provided in this manual assume that the appropriate wiring, circuit protection, and
metering are in place at the installation location.
To assist in the process of preparing the installation site, it is recommended that before you begin
installing the Quick Charging Station, you thoroughly review the contents of this document to
familiarize yourself with the required installation steps.
In case of any doubt regarding items described in this guide, please contact us at:
5.3.1
PACKAGING
EFAPOWER EV-QC45 is shipped in a package with the following dimensions (WxDxH):
▪
1150x850x2150mm (45.3x33.5x84.6 inches)
5.3.2
VISUAL INSPECTION
✓
Check
if
the
exterior
packaging
has been
damaged
by mechanical impacts or any accidents during
transportation
✓
If applicable,
check
if
the
exterior panels
of the EFAPOWER EV-QC45 are in
perfect
condition
✓
Check
if
the interior of the
Quick
Charger
Station is
clean
✓
Check
if
the
door
of the Quick Charger Station is
working
properly
✓
Check
for proper Quick Charger Station
protective
ground
connection
point
, which should be
interconnected with the low voltage switchboard ground connection during the installation
Rua Eng.º Frederico Ulrich - Apartado 3078
4471-907 MOREIRA MAIA - PORTUGAL
Tel: (+351) 229403241 - Fax: (+351) 229403209
[email protected]
www.electricmobility.efacec.com
2725 Northwoods Parkway, Ste. B
Norcross, Georgia 30071 USA
Tel: (1) 470 395-3648
-
Fax: (1) 770 446 8920
[email protected]
www.electricmobility.efacec.com
Power