2
INSTALLATION OPERATION & MAINTENANCE MANUAL
Index
Description
Page
INSTALLATION
General
3
Mechanical Installation
4
Water and Drain Connections
5
General Engineering Data
6
Electrical Connections
7
OPERATION
General
EC Fan
9
10
Heating Operation
11
Cooling Operation
11
Dehumidification Control
12
Humidification Cycle
12
PGD Details
14
Alarms
15
MAINTENANCE
General
18
Common Components
18
Electric Panel
–
Inspection & Functional Tests
19
Steam Humidifier Canister Cleaning & Removal
20
Fault Finding Guide
21
Monthly Maintenance Inspection Check
23
Annual Maintenance Inspection Check
24
While every precaution has been taken to ensure accuracy and completeness in this manual, EDPAC assumes no responsibility, and disclaims all liability
for damages resulting from use of this information or for any errors or omissions. Document reference E4.19-02-06-04