background image

Installing the SwitchAir

1. 

Before installing SwitchAir; Velcro tie the network switch power cords to power supply handle toward 

the centre of the switch. This will dress the switch power cords toward the centre where the SwitchAir 

brush strip is located - allowing a good SwitchAir to switch seal. The SwitchAir brush strip has ample 

width to allow you to just direct the switch power cords toward the centre. Power cords from one 

switch are allowed to pass through the brush strips of a unit below. Example shown of two networks 

switches would require two SwitchAir units.

2. 

Before installing SwitchAir; remove the lower network switch mounting screw from each side of the 

rack front rails (if necessary). Save these screws to be used in the next step for mounting the SwitchAir. 

The network switch upper screw will remain fastened.

3. 

SwitchAir is not in a fully extended position when shipped from the factory. Pull evenly on the 

chassis mounting tabs for the desired depth. Insert SwitchAir into the open rack space at the same U 

height as the switch. As SwitchAir is pushed into the space, the SwitchAir Rail Tabs will engage the 

network switch rails for support during installation. Keep pushing the SwitchAir into the space until 

the SwitchAir front mounting flanges are flush with the rack front rails. Reinstall the screws that were 

removed previously. Installation is now complete.