![Edge-Core ECWO5110 Installation Manual Download Page 18](http://html1.mh-extra.com/html/edge-core/ecwo5110/ecwo5110_installation-manual_2359748018.webp)
Chapter 2
| Installation Overview
AP Installation Tasks
– 18 –
Figure 8: Connecting AC Power
Verify AP Operation
Verify basic AP operation by checking the system LEDs.
When operating normally the Pwr/Sys LED should be on green, the Ethernet LED
on/blinking orange, and the wireless interface LEDs on/blinking orange.
Go to the section
“Understanding the System Status LEDs”
Figure 9: System LEDs
Connect the AC power cord to a nearby AC power source.
Connect Ethernet cable from the “DATA IN” port to a LAN switch.
Connect straight-through Ethernet cable from the AP to the “DATA & POWER OUT” port.
1
2
3
1
2
3
Task 5
System Status LEDs.
1
1
Summary of Contents for ECWO5110
Page 50: ......