background image

Quick Start Guide

–  6  –

7. Connect Network

Cables

Install SFP transceivers and connect network cables to port interfaces:

For RJ-45 ports, use 100-ohm Category 5, 5e or better twisted-pair cable for 
1000BASE-T connections, Category 5 or better for 100BASE-TX connections, 
and Category 3 or better for 10BASE-T connections.

First install SFP transceivers and then connect fiber optic cabling to the 
transceiver ports. The following transceivers are supported:

1000BASE-SX (ET4201-SX)

1000BASE-LX (ET4201-LX)

1000BASE-ZX (ET4201-ZX)

As connections are made, check the port status LEDs to be sure the links are valid.

8. (Optional) Extend

PoE Budget to 740W

(ECS2100-28PP only)

If you have purchased an optional Extended Power Supply (EPS460W) and Chassis 
(PS3000), follow the instructions below to connect it to the ECS2100-28PP and to 
AC power.

Note:

 

The ECS2100-28PP default PoE power budget is 370 W, by purchasing an 

Extended Power Supply kit, the ECS2100-28PP can extend its PoE power budget up 
to 740W.

10/100/1000BASE-T RJ-45 Port.

Twisted-pair Cable with RJ-45 Plug.

1

2

1

2

Summary of Contents for ECS2100 Series

Page 1: ...0 100 1000BASE T 2 SFP uplink ports 8 PoE ports ECS2100 28T 24 10 100 000BASE T 4 SFP uplink ports ECS2100 28P 24 10 100 000BASE T 4 SFP uplink ports 24 PoE ports ECS2100 28PP 24 10 100 000BASE T 4 SF...

Page 2: ...nd CLI Reference Guide can be obtained from www edge core com support download user manual 2 Install the Switch Rack Mounting The switch can be mounted in a standard 19 inch rack or on a desktop or sh...

Page 3: ...ource to power on Verify that the external AC power requirements for the switch can be met as listed below ECS2100 10T AC 100 240 V 50 60 Hz 0 5 A ECS2100 10P AC 100 240 V 50 60 Hz 2 1 A ECS2100 28T A...

Page 4: ...ding terminal screw on the switch rear panel must be permanently connected to earth 5 Verify Switch Operation Verify basic switch operation by checking the system LEDs When operating normally the Diag...

Page 5: ...as a default management IP address of 192 168 2 10 and a subnet mask of 255 255 255 0 You must set your PC IP address to be on the same subnet as the switch that is the PC and switch addresses must bo...

Page 6: ...ansceivers are supported 1000BASE SX ET4201 SX 1000BASE LX ET4201 LX 1000BASE ZX ET4201 ZX As connections are made check the port status LEDs to be sure the links are valid 8 Optional Extend PoE Budge...

Page 7: ...9 inch rack and power on Install the PS3000 chassis in a standard 19 inch rack Install one or more EPS460W PSUs in the chassis The chassis can support up to three EPS460W PSUs Use the PSU cable provid...

Page 8: ...s are measured under a 100 percent loading test and should be used as estimates for planning purposes AC Input Power ECS2100 10T AC 100 240 V 50 60 Hz 0 5 A ECS2100 10P AC 100 240 V 50 60 Hz 2 1 A ECS...

Reviews: