
C
HAPTER
3
| Installing the Switch
Mounting
– 41 –
D
ESKTOP
OR
S
HELF
M
OUNTING
1.
Attach the four adhesive feet to the bottom of the first switch.
Figure 12: Attaching the Adhesive Feet
2.
Set the device on a flat surface near an AC power source, making sure there
are at least two inches of space on all sides for proper air flow.
3.
If installing a single switch only, go to
“Connecting to a Power Source” on
4.
If installing multiple switches, attach four adhesive feet to each one. Place
each device squarely on top of the one below, in any order.
Summary of Contents for ECS2000-50T
Page 1: ...Installation Guide www edge core com ECS2000 50T 50 Port Layer 2 Gigabit Ethernet Switch...
Page 2: ......
Page 4: ......
Page 14: ...COMPLIANCES AND SAFETY STATEMENTS 14...
Page 16: ...ABOUT THIS GUIDE 16...
Page 19: ...CONTENTS 19 INDEX 64...
Page 20: ...CONTENTS 20...
Page 22: ...TABLES 22...
Page 29: ...CHAPTER 1 Introduction Overview 29...
Page 63: ...GLOSSARY 63...
Page 65: ...INDEX 65...
Page 66: ......
Page 67: ...ECS2000 50T E092012 MW R01...