– 34 –
3
I
NSTALLING
THE
S
WITCH
This chapter describes how to install the switch.
S
ELECTING
A
S
ITE
◆
The site should:
■
be at the center of all the devices you want to link and near a power
outlet.
■
be able to maintain its temperature within 0 to 50 °C (32 to 122 °F)
and its humidity within 10% to 90%, non-condensing
■
provide adequate space (approximately two inches) on all sides for
proper air flow
■
be accessible for installing, cabling and maintaining the devices
■
allow the status LEDs to be clearly visible
◆
Make sure twisted-pair cable is always routed away from power lines,
fluorescent lighting fixtures and other sources of electrical interference,
such as radios and transmitters.
◆
Make sure that the unit is connected to a separate grounded power outlet
that provides 100 to 240 VAC, 50 to 60 Hz, is within 2 m (6.6 feet) of each
device and is powered from an independent circuit breaker. As with any
equipment, using a filter or surge suppressor is recommended.
Summary of Contents for ECS2000-26T
Page 1: ...Installation Guide www edge core com ECS2000 26T 26 Port Layer 2 Gigabit Ethernet Switch...
Page 2: ......
Page 4: ......
Page 14: ...COMPLIANCES AND SAFETY STATEMENTS 14...
Page 16: ...ABOUT THIS GUIDE 16 JULY 2012 REVISION This was the first revision of this guide...
Page 20: ...TABLES 20...
Page 27: ...CHAPTER 1 Introduction Overview 27...
Page 61: ...GLOSSARY 61...
Page 63: ...INDEX 63...
Page 64: ......
Page 65: ...ECS2000 26T E102012 MW R02...