Edge-Core AS7315-27X Quick Start Manual Download Page 2

Quick Start Guide

–  2  –

1.

Connect the ground wire / protective earth.

2.

Connect the -36 – -72 VDC wire.

3.

Connect the DC return wire.

Verify Power Status

1.

Verify the router is receiving power by checking the system LEDs.

After power on, the PSU1/PSU2, DIAG, ALRM, and FAN LEDs 
should all be on green.

Connect Network Cables

1.

For the RJ-45 Management port, connect 100-ohm Category 5, 
5e or better twisted-pair cable.

2.

Connect DAC cables to the SFP+/SFP28/QSFP28 slots. Or first 
install SFP+/SFP28/QSFP28 transceivers in the slots and then 
connect fiber optic cabling to the transceiver ports. 

3.

As connections are made, check the port status LEDs to be sure 
the links are valid. 

Connect Timing Ports and GPS Antenna

1.

Use a shielded cable to connect the Building-Integrated Timing 
Supply (BITS) port to other devices that use BITS synchronization 
signals.

2.

Use a shielded cable to connect the Pulse-Per-Second (PPS) / 
Time-of-Day (ToD) port to other devices that use these 
synchronization signals.

3.

Attach an external GNSS antenna to the GNSS Antenna port for 
clock synchronization with GPS time.

Perform Initial System Boot

1.

If the network operating system (NOS) installer is located on a 
network server, first connect the RJ-45 Management (Mgmt) port 
to the network using 100-ohm Category 5, 5e or better twisted-
pair cable. (Not required if the NOS installer is located on 
attached storage.)

2.

Boot the router. Wait for the ONIE software to locate and 
execute the NOS installer, and then wait for the installer to load 
the NOS software image.

Subsequent router boots will bypass ONIE and directly run the 
NOS software.

PSU and Fan Tray Replacement

1.

Press the PSU/fan tray release latch and pull the handle to 
remove the PSU/fan tray from the chassis.

2.

Slide a replacement PSU/fan tray into the chassis until the 
release latch clicks into its secure position.

Caution:

 Use a UL/IEC/EN 60950-1 certified power 

supply to connect to a DC converter, and a #14 AWG/
1.5 mm

2

 (for 36 VDC to 72 VDC PSU) wire to connect to a 

DC PSU.

Attention:

 Utilisez une alimentation certifiée UL/IEC/EN 

60950-1 pour le connecter à un convertisseur CC et un 
câble AWG #14/1.5 mm

2

 (pour 36 VDC à 72 VDC) pour 

vous connecter à une alimentation CC.

3

2

1

5

1

6

2

3

1

Note:

 Refer to the network operating system (NOS) installer 

and NOS documentation for details on software options 
and set up for ONIE.

7

2

3

1

8

9

1

1

Reviews: