Edge-Core AS4630-54TE Quick Start Manual Download Page 2

Quick Start Guide

–  2  –

Mount the Switch

Connect Power

Verify Switch Power

Perform Initial System Boot

Warning: 

For a safe and reliable installation, use only the 

accessories and screws provided with the device. Use of other 
accessories and screws could result in damage to the unit. Any 
damages incurred by using unapproved accessories are not 
covered by the warranty.

Avertissement:

 

Pour une installation sûre et fiable, utilisez 

uniquement les accessoires et les vis fournies avec l’appareil. 
L’utilisation d’autres accessoires et vis pourrait endommager 
l’appareil. Les dommages causés par l’utilisation d’accessoires 
non approuvés ne sont pas couverts par la garantie.

Caution: 

The device includes plug-in power supply (PSU) and 

fan tray modules that are installed into its chassis. Make sure all 
installed modules have a matching airflow direction. 

Attention:

 Le appareil comprend des modules 

d’alimentation et de modules de ventilation installés dans son 
châssis. Assurez-vous que tous les modules installés ont une 
direction d’air adaptée.

Note:

 The device has the Open Network Install Environment 

(ONIE) software installer preloaded on the switch, but no switch 
software image. Information about compatible switch software 
can be found at 

www.edge-core.com

.

Note: 

Model name and approval markings are indicated on 

the product label located on the bottom of the device.

1

1. Attach the Brackets

Use the included screws to attach the front- and rear-post brackets.

2. Mount the Switch

Mount the switch in the rack and secure it with rack screws.

3. Lock the Rear-Post Brackets

Use the included screws to lock the position of the rear-post brackets.

Note:

 For switches with ONIE software pre-loaded, refer to the 

network operating system (NOS) installer and NOS 
documentation for details on software options and set up for 
ONIE.

Optional Slide-Rail Installation

An optional slide-rail kit is available for rack installation. Follow the
installation procedure provided with the kit.

2

AC Power

Install two AC PSUs and connect them to an AC power source.

3

Check the PSU LEDs 

The PSU1/PSU2 LEDs should be on green when operating normally.

4

1. ONIE Installer Software

If the network operating system (NOS) installer is located on a network 
server, first connect the RJ-45 Management (Mgmt) port to the network 
using 100-ohm Category 5, 5e or better twisted-pair cable. (Not 
required if the NOS installer is located on attached storage.)

2. Boot the Switch

Wait for the ONIE software to locate and execute the NOS installer, 
and then wait for the installer to load the NOS software image. 
Subsequent switch boots will bypass ONIE and directly run the NOS 
software.

Installation

Summary of Contents for AS4630-54TE

Page 1: ...en OK Amber fault PRI LED Green primary unit Amber secondary unit PSU LEDs Green OK Amber fault STK LEDs Green stacking ports active FAN LED Green OK Amber fault PoE LED Off RJ 45 Port LEDs Green link...

Page 2: ...e found at www edge core com Note Model name and approval markings are indicated on the product label located on the bottom of the device 1 1 Attach the Brackets Use the included screws to attach the...

Page 3: ...into the bottom QSFP28 port on the bottom unit and the other end into the top QSFP28 port on the top unit 5 Reboot Reboot each switch in the stack to start the stack operations Hardware Specification...

Page 4: ...s 1 2 3 4 5 www edge core com 1 1x USB 2 1x 3 1x 4 LED 5 48x RJ45 2 5G PoE 6 4x SFP28 25G 7 2x QSFP28 40G 100G 8 3x 9 2 x AC 8 1 9 7 6 5 2 3 4 6 STK M S LED PRI LED PSU LED STK LED LED OK PoE LED RJ 4...

Page 5: ...5 PSU ONIE www edge core com 1 1 2 3 ONIE NOS NOS ONIE 2 AC AC PSU AC 3 PSU LEDs PSU1 PSU2 LED 4 1 ONIE NOS 100 ohm 5 5e RJ 45 Mgmt NOS 2 ONIE NOS NOS ONIE NOS...

Page 6: ...C 40 F 158 F 5 95 2 x 150 W Power Supplies AC 100 240 Vac 50 60 Hz 3 1 5 A 150 EN 55032 2015 AC 2016 Class A EN 61000 3 2 2014 Class A EN 61000 3 3 2013 FCC Class A VCCI Class A CCC GB 9254 2008 Clas...

Page 7: ...1 2 3 4 5 www edge core com 1 1x USB 2 1x 3 1x 4 LED 5 48x RJ45 2 5G PoE 6 4x SFP28 25G 7 2x QSFP28 40G 100G 8 3x 9 2x PSU 8 1 9 7 6 5 2 3 4 6 STK M S LED PRI LED PSU LED STK LED LED PoE LED RJ 45 LED...

Page 8: ...8 PSU ONIE www edge core com 1 1 2 3 ONIE ONIE NOS NOS 2 PSU 3 PSU LED PSU1 PSU2 LED 4 1 ONIE NOS 100 5 5e RJ 45 Mgmt NOS 2 ONIE NOS NOS ONIE NOS...

Page 9: ...F 158 F 5 95 2 x 150 W Power Supplies 100 240 Vac 50 60 Hz 3 1 5 A 150 W max EN 55032 2015 AC 2016 Class A EN 61000 3 2 2014 Class A EN 61000 3 3 2013 FCC Class A VCCI Class A CCC GB 9254 2008 Class A...

Reviews: