background image

2

www.edenarbors.com 

1

Lay out the top rail, bottom rail, horizontal spindles, and

vertical spindles as shown. Start by inserting the 7 vertical

spindles into the 3 horizontal rails.

Note

 that the routed holes on the horizontal rails are slightly

offset from the centre. Ensure that the holes are aligned as per

the inset image.

Continue to insert the assembly into the top and bottom

rails. 

Note

 the difference between the two rails. The bottom rail

only has one routed side whereas the top rail has additional

holes for the arch spindles.

Align and insert the rails into one of the post. 

Note

 that the pre-drilled holes are located on the back side

of the trellis. 

Proceed with the other post.

Flip the trellis over and using the provided screws, fasten

the posts to the top and bottom rails in place as shown.

1

2

3

4

S T E P   O N E

2

3

NOTE:  Assembly will be easier if performed by two people

Note orientation

5

5

Summary of Contents for The Vienna Trellis

Page 1: ...s Steel Screw 20 Tools You Will Need Cordless Drill Hammer Tape Measure Level Shovel General Information Read Instructions through carefully before beginning assembly When assembling components place on a non abrasive surface i e shipping box to avoid scratching We recommend an area approx 5 x 8 for unobstructed assembling You should not need to use excessive force when assembling component The Vi...

Page 2: ...sembly into the top and bottom rails Note the difference between the two rails The bottom rail only has one routed side whereas the top rail has additional holes for the arch spindles Align and insert the rails into one of the post Note that the pre drilled holes are located on the back side of the trellis Proceed with the other post Flip the trellis over and using the provided screws fasten the p...

Page 3: ...keystone body as shown below followed by the two arches Note that the arches will be marked with a sticker where they meet the keystone Using two of the provided screws fasten the arches into the keystone insert as shown Drive two more screws to the underside of the keystone Snap the top and bottom lid to complete the arch assembly Arch Assembly 1 Insert first 2 3 4 1 2 3 4 Sticker Sticker ...

Page 4: ...e image aside for orientation Insert the arch spindles into the top rail as shown The short spindles would be on the outer side of the rail and the long spindles would be on the inner side of the rail Starting on one end guide the arch assembly and arch spindles into the pre routed holes as shown Fasten the arch assembly to the posts using four screws 2 per post provided Arch Assembly 1 2 3 4 1 Lo...

Page 5: ...onawooddeck orconcretesurface pleaseseeyourhardwarestorefortheappropriate galvanized bracket hardware STEP FIVE Move the trellis to its final location When you are satisfied with the location mark the positions of the posts then move the trellis aside and lay it carefully on it s side Excavate the 2 post holes approximately 12 deep x 6 diameter Carefully move the trellis back into position Level i...