background image

Maintenance:

In a timely manner the centralizer skeleton.

 1.If the ground not level off, loose soil layer thickness is differ, wall shed may tilt to one end, once found, should be timely the centralizer, in case of deformation.
   The shed may be slant when facing the un-level ground or loose soil layer, please righting the shed urgently to avoid deformation
 2.Prevent increased loading-weight artificially.
    Don't let any lentils, towel gourd, pumpkin and climbing fruits and vegetables to grow up on the canopy, otherwise if it is windy and rainy, skeleton is
    unbearable, and easy to cause skeleton crack, broken, collapse Avoid kinds of  vine plant climbing on the canopy, or it can not bearing for the wind and heavy
    rain, broken,collapse may accured.

The sunshine board maintenance:

  1.IIn the using canopy, note do not use sharp objects collision films, avoid to cut films. Be careful not collide with a sharp object films,in order to avoid scratched
     films when using.
  2.If films appear rupture, can use glue to repair or repair with transparent tape. Available polyurethane adhesive for repairing. Often keep the films clean, generally
     the PC sheet replacement using 6 ~ 10 years later, so as not to affect the light transmittance.  Using transparent tape adhesive to patch cracks of film when any
     broken in case .Keep clean films,it will better replaced by new panels after 6-10years to avoid affect the Light transmittance
  3.The flame retardant in polycarbonate material, but still need to stay away from fire, avoid softening deformation.
      As Polycarbonate is fire-retardant materials, please stay away from the fire ,to avoid  softening deformation.

Frame maintenance:

  1.The frame is aluminum alloy structure, if there is a white problem can wipe with a cloth in time, under high temperature and wet environment.
       All frames are made of alloy aluminum. White spots may appeared under wet-hot environment, just wipe it.

  2.If there is any distortion calibration shall be carried out in a timely manner in order to avoid sunshine board out, If Polycarbonate out of frame, please removed

     screws. Carried out in accordance with the manual installation steps, and partial restoration.Any distortion calibration shall be carried out in a timely to avoid the

     sunshine board fall off. Repair work should  be according to the IM.

   3.If connection piece serious rust, should change in time the new screws and connectors to ensure connection parts are firm

     Please replaced the serious rust screws and connection for stable.

How to do in bad weather:

  1.If there is lightning may not stay in the shed, because aluminum alloy skeleton is conductive and will be caused serious consequences

     Do not stay under shed when lightning.

  2.Wind power reaches 70 km/h should be prepared ready to defense equipment, fixed wall shed. Fixed method with a strong rope or cable connect the cornice

     work four Angle of anchor  block inserted into the soil or tied in a nearby tree stem > 10 cm in diameter. Pay attention to the weather turns good dismantled after

     the rope or cable to avoid injury and pedestrian.

     Please get defensive measures when facing heavy wind (abt 70km/H). Reinforce by steel rope and anchors which insert into ground or Strapping on a big tree

3.Clear in time at the top of the deciduous leaves led to the decrease of the canopy transparency, heat preservation effect is reduced

   To avoid greenhouses reduced transparency, heat preservation effect is reduced, please clean up the leaves at the top.

4.During snow, removal work in time, if not timely to snow removal, Use solid wooden plate supporting internal intermediate point and middle position of

   polycarbonate, prevent snow collapsing the wall shed.

   To prevent collapsing by snow, please remove the snow in time,Or support by a wooden stick support in the center of the sunshine board for reinforcement

-21-

Summary of Contents for SR-A43

Page 1: ...ou find all parts in the carton box in the correct type and quantity as mentioned in the list illustrated in every page accordingly Please carry out the steps in the order set out in these instruction...

Page 2: ...a multi part assembly Allow at least 90 minutes for assembly Selecting a site choose a sunny level position away from overhanging trees If you are fixing your Wall shed directly to a solid concrete fo...

Page 3: ...tric safety 4 Be careful when using the kind of blunt tools like hammer 5 Wearing long sleeve cotton overalls gloves and helmet during installation and wear safety glasses when using power tools 6 No...

Page 4: ...6 1 7 2 NO Qty CONNECT 2870mm 8 8 B1 2 B2 2 SCREW WINDOWS B3 2 B5 2 S2 2 B7 1 1000mm 3914mm 3914mm 3914mm 2000mm F3 44 NO Qty F5 6 F2 36 S5 6 Window A Window A Window B Window B Window C Window C WIND...

Page 5: ...B1 B1 B2 B2 8 8 8 8 B3 B3 B5 B5 S2 S2 B7 S8 S8 B11 B11 S4 S4 S4 S4 The side coated in white film should be directed towards the sun as it is equipped with UV protection SCHEMATIC INSTALLATION DIAGRAM...

Page 6: ...6 7 x2 F2 x8 B1 x2 7 B1 x2 x2 F2 F2 F2 F2...

Page 7: ...7 B2 x2 F2 x8 3 3 B2 B2 F2 F2 F2 F2 F2 F2 F2 F2 3 3 B2 B2 F2 F2 F2 F2 F2 F2 F2 F2...

Page 8: ...8 8 x8 2 x2 1 8 8 8 8 8 8 2 1 x2...

Page 9: ...9 Level Meter 6 F5 x6 254cm 10cm Level Meter x6 50mm 8mm x6 x6 F5 8mm 6 6...

Page 10: ...10 F2 x6 2 1 2 2 6 6 6 6 F2 F2 F2 NO 1 AND NO 2 ARE ATTACHED TO THE WALL...

Page 11: ...2 2 6 Window A Window A Window B Window B Window C Window C x2 x2 Window B Window B Window A Window A Window C Window C 2 1 2 Window A Window B Window C x2 2 PANELS NO 1 AND NO 2 ARE ATTACHED TO THE G...

Page 12: ...12 F3 x6 Window A Window A Window B Window B Window C Window C F3 F3 F3 F3 F3 F3 F3 F3 F3 F3 F3 F3 Window A x2 6 6 6 6 6 2 2 1 1 2 2...

Page 13: ...13 F2 x6 3 2 2 1 F2 F2 F2 F2 F2 F2 F2 3 2 3 3 3 1 2 2 F2 F2 F2 F2 F2 F2 S3 x5 S3 x5...

Page 14: ...F3 x6 5 F3 F3 F3 F3 F3 5 3 1 2 2 F3 5 3 2 5 5 5 1 2 2 F3 F3 F3 F3 F3 F3 F3 S3 14...

Page 15: ...x6 1 People WALL F5 10mm 1 People 1 People 7 7 x6 WALL 6 F5 F5 6 x2 7 B2 3 15...

Page 16: ...F2 x8 x6 WALL Tighten the screws F2x4 F2x4 7 7 3 x4 7 3 F2 F2 S4 x4 F4 F3 x2 S4 S4 S4 S4 x2 S4 2 C B F3 1 S4 B C F4 1 F4 B B C C A A S4 S4 F5 16...

Page 17: ...x4 UP F3x3 F3x3 F3x3 F3x3 B11 B11 WINDOW C WINDOW C B11 B11 2 2 1 F3 B11 Window C x2 130mm 130mm 130mm 130mm Window C 3 90 90 If the window C has 6 holes you can ignore this step Window C B11 B11 F3 F...

Page 18: ...18 F3 x18 B3 x2 B5 x2 S2 x2 B7 B3 B3 B5 B5 S2 S2 7 7 x2 x2 B3 7 B5 F3 F3 F3 F3 F3 F3 F3 7 S2 F3 F3 x2 B7 S2 3...

Page 19: ...19 F6 x8 S8 x8 S5 x6 F6 F6 S8 S8 S5 S5 S5 x2 7 B1 F6 F6 F6 F6 Cover all S8 tapping it with wooden hammer ensure it will not fall off S5 6 x6 S5 S5 S5...

Page 20: ...20...

Page 21: ...made of alloy aluminum White spots may appeared under wet hot environment just wipe it 2 If there is any distortion calibration shall be carried out in a timely manner in order to avoid sunshine board...

Reviews: