6a.
Door
Lay the parts coded in
fig. 8
on the ground and attach the vertical door bars
(
751
and
752
) to the top door bar (
987
) using the No. 6 x 19mm self-tapping
screws (
401
) provided as in
FF
.
It is much easier to use an electric drill for this
,
making sure the t
orque
setting is correct
, i.e. the lowest setting.
Make sure the
holes between the bottom door bar and the intermediate
bar are further apart
than the top
in order to fit the shorter top glass pane
B
.
T
his can be seen by laying the two vertical door bars side by side to
match the holes.
Before fitting the intermediate door bar (986) check which side the door pull
should be on, depending on whether your door is on the left side or right side
of the greenhouse.
For instance, if your door is on the right, the door pull
should be on the left.
Fit the intermediate door bar (
986
) and the bottom door bar (
988
) as in
GG
and
HH
.
Fit the wheel-housing (
989
) to the top of the vertical door bars as in
DD
.
Fit the door bottom bar sliders (
478
) making sure the ears clip over the door
bar
, using a
spoon
if necessary
(to fit fully home) as in
fig. 8
.
Stick flush door pulls (
992
) into the holes in both sides of the intermediate
door bar as in
EE
.
14
Summary of Contents for Silverline 106 Lean-To
Page 3: ...1106 No 6 x 16mm self tapping screws 1476 612 1774 5 1839 2...
Page 4: ...1633 PLEASE NOTE PART 00649 IS A REDUNDANT ITEM THAT IS NO LONGER REQUIRED 3...
Page 8: ...M J H G I K N F L F 7...
Page 10: ...T U R O S Q P 9 1 x Extra bolt 3 x Extra bolts 1 x Extra bolt 3 x Extra bolts...
Page 12: ...Plumbline Spirit Level Tanalised timber batten V Y AA BB Z W CC 11...