eDecks Queen Anne Fitting Instructions Manual Download Page 11

Step 11

Don’t forget to check your work with a level as you go!

Page 11 of 13

INSTALL THE HANDRAILS

Pre-Building the spindles and handrails is the next step.

Accurately measure between pergola posts and cut the hand and base rails accordingly, 

there should be a 125mm gap between each spindle 

www.eDecks.co.uk

All images are for illustration only, Please see individual item listings for actual item specifications

Queen Anne Fitting Instructions

 

 

Then complete the handrail section

by fixing the upper part of the handrail

to the lower part of the handrail

Do this by screwing up through the 

underside of the lower handrail into 

the top part of the handrail

Screw into each spindle

from under the baserail

Screw through the lower

handrail into each spindle

Upper Handrail

Lower Handrail

Approx

125mm Gap

Summary of Contents for Queen Anne

Page 1: ...ground www eDecks co uk All images are for illustration only Please see individual item listings for actual item speci cations Queen Anne Fitting Instructions Using the decking joists provided in the...

Page 2: ...rutt will need to be set 200mm down into a concrete base leaving 400mm of each strutt exposed C Once raising strutts are securely set in concrete base lift the assembled joist frame to be level with t...

Page 3: ...se please select how high you would like the pergola posts please cut accordingly Each Pergola Post needs securing in each corner and depending on the size of the kit posts may need tting in between I...

Page 4: ...images are for illustration only Please see individual item listings for actual item speci cations Queen Anne Fitting Instructions Your step stringers must be set at a maximum of 600mm apart Use the 5...

Page 5: ...actly to the frame working in the opposite direction to the joist work when laying the boards make sure you leave a 5mm gap between each board to allow room for expansion www eDecks co uk All images a...

Page 6: ...e required to work around the step and riser of the 4 stringers installed in step 4 Step 6 Don t forget to check your work with a level as you go Page 6 of 13 INSTALL DECKING BOARD STEPS www eDecks co...

Page 7: ...steps FRONT Step 7 Don t forget to check your work with a level as you go Page 7 of 13 INSTALL FASCIA BOARDS www eDecks co uk All images are for illustration only Please see individual item listings...

Page 8: ...th a level as you go Page 8 of 13 INSTALL SUPPORT RAFTERS First secure the 3 supporting rafters to the posts www eDecks co uk All images are for illustration only Please see individual item listings f...

Page 9: ...RAFTERS Space the remainder of the rafters across the top of the support rafters www eDecks co uk Using the Pergola Clips Provided with your kit to secure All images are for illustration only Please s...

Page 10: ...10 Don t forget to check your work with a level as you go Page 10 of 13 INSTALL DIAGONAL CROSS SUPPORTS www eDecks co uk All images are for illustration only Please see individual item listings for a...

Page 11: ...s co uk All images are for illustration only Please see individual item listings for actual item speci cations Queen Anne Fitting Instructions Then complete the handrail section by xing the upper part...

Page 12: ...nstall to the kit Step 11 Cont d Once this is complete Sit back and enjoy Page 12 of 13 INSTALLTHE HANDRAILS www eDecks co uk All images are for illustration only Please see individual item listings f...

Page 13: ...e this is complete Sit back and enjoy Page 13 of 13 FINISH www eDecks co uk All images are for illustration only Please see individual item listings for actual item speci cations Queen Anne Fitting In...

Reviews: